My WebLink
|
Help
|
About
|
Sign Out
Home
2003-12-04 tuluwehi
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2003
>
2003-12-04 tuluwehi
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:07:48 PM
Creation date
6/14/2011 4:07:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
projects that the traffic situation along Huallai Road will be alleviated. The design of the <br />` <br />collector road and the intersection improvements down at Queen Kaahumanu Highway have <br />all been designed to accept the traffic coming from the mauka sections down through the <br />subdivision. <br />GALDONES:Mr. Lim, what about the noise abatement? <br />LIM:With regard to construction equipment and things like that? <br />GALDONES:That's correct. <br />LIM:I guess we will follow the applicable noise requirements for construction. <br />I think what they're probably referring to when they're talking about the Kona Orchards <br />Subdivision is you probably got one lot at a time going with relatively small bulldozer <br />operators. We would be obviously working with licensed contractors who have the hours of <br />operation that are followed by the industry in Kona. I think when you run into the small dozer <br />operators, those are the guys that come in at, you know, weekends and night times and try to <br />work. <br />GALDONES:Mr. Lim, you had also submitted a amendment to Condition F. <br />LIM:That is correct. That was solely intended to clarify which roadways <br />would be constructed to County-dedicable standards and dedicated to the County. As I <br />indicated, it would be Easement A-3 and Road Lot A, which were the ones coming down the <br />middle. That's the 50-foot collector which would be improved with curb, gutter, sidewalks, <br />and this is upon an alignment that has been suggested by the Department of Public Works to <br />try to link up a north-south road through the -, across the mountainside. <br />GALDONES:Norman, is that acceptable? <br />HAYASHI:That would be acceptable, however, we would also like to add to that <br />particular condition, and that would be Condition F, in addition to what was proposed by the <br />Applicant, we would like to add that -, the following. Concrete curb, gutter, and sidewalk <br />shall be provided throughout the length of the proposed Road Lot A to maintain consistency <br />with the proposed road section in the adjacent Huallai Heights Subdivision. The <br />improvements shall meet with the approval of the Department of Public Works. <br />GALDONES:Mr. Lim. <br />LIM:That is acceptable. We've already planned those in. <br />GALDONES:Thank you. Commissioners, any further questions of Mr. Lim? <br />YUEN:I have a question. Which is Easement A-3? <br />13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.