Laserfiche WebLink
LIM:Easement A-3 is the easement that's off the property, it's in the Huallai <br />Heights Subdivision. It's the section of road that will connect the 60-foot mauka-makai <br />collector to Road Lot A within the subdivision. You can see that on Exhibit C. <br />YUEN:Oh, okay. I didn't understand that. Then we should say that Easement A-3 <br />and Road Lot A are constructed with concrete curbs, gutters, and sidewalks. <br />LIM:Yes, I guess -. <br />YUEN:That was the intent. <br />LIM:That's the intent, but it's technically, you know, Easement A-3 is not on <br />the property, it's off-site, yeah. <br />YUEN:Who is going to build Easement A-3? <br />LIM:That's going to be a cooperative effort between Huallai Heights and the <br />developer, Uluwehi. <br />YUEN:Is Easement A-3 in Huallai Heights? <br />LIM:Yes. <br />YUEN:Okay. So that's already required to be -. <br />LIM:That's already required. <br />YUEN:All right, fine. <br />LIM:Yes. <br />YUEN:Then that's fine. <br />HAYASHI:That would mean that we don't need to include Easement A-3 as far as <br />the amendment proposed by the Applicant? <br />LIM:As Mr. Witcher informs me that the Easement A-3 is already required to <br />be constructed with the curb, gutter, sidewalks and a 50-foot wide -. <br />YUEN:Okay. <br />LIM:Right-of-way, so we probably don't need that in this particular condition. <br />14 <br /> <br />