Laserfiche WebLink
provided to you this morning; and the top of it says Dien Jung Lin Nekoba, REZ 07-000071. But <br />these include the Planning Director’s new proposed conditions. <br />The Ramsayered amendments that we’ve made to Condition D are just to make that paragraph <br />internally consistent such that either the consolidation of the Parcels 25 and 26 or the <br />establishment of cross-easements to permit traffic circulation between the two parcels would <br />occur upon construction of a new building. I think that was the idea that we were trying to reach <br />at. <br />Proposed new Condition E is the Planning Director’s recommendation where because of the <br />CN-10 zoning they didn’t want us to subdivide it into more than the existing two lots; and we’re <br />agreeable with that condition. The proposed and revised Condition E is that we would provide, <br />this was our request, that we would provide the curb, gutter, sidewalk improvements along the <br />frontage of Hinano Street, which is on the right side of the drawing there, upon the construction <br />of any new dwellings, I mean, excuse me, new buildings on Parcel 26. We felt that until the new <br />buildings would be implemented that there would be no sense in putting curbs, gutters, sidewalks <br />on the existing property. <br />Then the last condition that we’re calling the proposed new condition based upon the discussions <br />with the adjacent property owners is that, their main concern, I think, expressed at the last <br />hearing was that the proposed impacts by the commercial uses would impact upon their dwelling <br />and their proposed residence that they’ll be building later on. So we met with them on the <br />conditions that we were proposing, and then we’ve given them a copy to review. I think <br />Mrs. McCrary is here today to testify also. It states that the applicant shall provide a solid wall <br />not to exceed 6 feet in height as a buffer along the common boundary of these parcels, 126 and <br />the McCrary and Jeffrey Joseph parcel. I think that they’re in agreement with that. She also <br />mentioned today that because of the deposit of gravel on the Nekoba Parcel 26 adjacent to their <br />property they’re experiencing a little bit more water runoff. We believe that the construction of <br />the solid rockwall or solid wall, or whatever they do, will address the drainage issue and will <br />make sure that it channels the water back out towards the roadway. And I think that they also <br />talked about preserving a couple of trees along their boundary; and to the extent that the <br />Nekobas, I think the Nekobas have agree to that. I don’t know exactly now which trees they are <br />but I think the parties understand which trees.So maybe having Ms. McCrary come up to talk <br />would help, too. <br />ALAMEDA: Sure. She’ll testify. We have her name here so she’ll be coming up <br />shortly. Commissioners, any questions for our applicant’s representative, Mr. Lim? <br />Commissioner Watanabe. <br />WATANABE: Mr. Lim, we’ve received also newly worded conditions or revised <br />Conditions D, E and F from the Planning Department. Have you had a chance to review those? <br />LIM: Yes. <br />WATANABE: I believe essentially they say the same thing that your proposed condition <br />says with the exception of the new condition for the 6-foot wall. Are you in agreement with <br />that? <br /> EXHIBIT A 4 <br /> <br />