Laserfiche WebLink
YUEN:I dont have a problem with the second, that the improvements will be <br />constructed before, the improvements will be completed before the CO or rather than the <br />construction of permits for the other residential structures. What Im concerned about in the <br />prior one is if that you have to, if you need a, if you need a letter of map change to build certain <br />buildings-. <br />LIM:Right, I just wanted to be able to work on other portions of the project. I <br />mean obviously yeah we need to get a letter of map change and we have to do that prior to <br />getting any construction permits. But for our areas of the project that are outside the drainage <br />area I think we should be able to grade over there. Thats probably where were going to go first <br />I think. <br />YUEN:I can work on wording that will do that, thats fine. <br />LIM:Thankyou. <br />SIRACUSA:Excuseme.Clarificationplease. <br />ALAMEDA:Sure.CommissionerSiracusa? <br />SIRACUSA:WellIvenevercomeacrossthisletterofmapchangeandIwonderif <br />somebody could explain it to me. <br />ALAMEDA:Staff? Director Yuen? <br />YUEN:Theres an existing FEMA map for the property that shows the flood <br />zones and sometimes the, the, because of the way these are done theyre not done at a great level <br />of detail. In other words, that they may not be completely accurate. And, say very often an <br />applicant or a landowner will want to, will say well this is not where the flood really goes. And <br />so theres a process for getting the flood zones, for getting the mapping changed and thats called <br />a letter of map change. And essentially, the U.S. Army Corps of Engineers does the heavy <br />lifting on this. It does get approved by the County but its sent to the U.S. Army Corps of <br />Engineers to review and see that its accurately done. And then the Army Corps of Engineers <br />authorizes it then the changes get entered onto the FEMA maps. <br />ALAMEDA:Thank you. Commissioner Siracusa any follow-up? <br />SIRACUSA:No, that, I needed a definition and explanation, I got it thank you. <br />ALAMEDA:Yeah, thats good thank you. Mr. Lim? Go ahead. <br />LIM:Continuing on condition W on the second line, wed like to add the words <br />within the project. So it would read, the applicant, its successors and assigns shall be responsible <br />for the cost of any sound abatement measures within the project that are required to qualify the <br />Alii Parkway for Federal Construction Funds. This is that section that talks about the issues for <br />traffic noise to the project. And then we have a couple of more, just technical things. Condition <br />EXHIBIT B <br />18 <br /> <br />