Laserfiche WebLink
WATANABE:60 foot. <br />YUEN:It would be quite a differentstandard than what they have in mind. <br />ALAMEDA:Commissioner Siracusa? <br />SIRACUSA: Yes I wanted to backtrack just a minute to condition C since were moving <br />on here. I want to say that having seen a lot of cases where were presented with a partial plan <br />for a property and then we dont know what the full you know thing is going to be down the line. <br />And Ive commented on this before about my dissatisfaction with having to make decisions <br />based on-. Parker School was one of those, yeah where we had a big lot and were only talking <br />about developing part of it. And I felt very uncomfortable with that. And so I want to thank you <br />for even though youre planning to develop in phases about giving us the full picture ahead of <br />time that really helps a lot. So I want to thank you for that. And, say that with that <br />understandingIpersonallyhavenoproblemwithextendingthe3yearsto5toallowforthat.So <br />I just wanted to get that. You know since were moving along from number to number here. <br />Before we get too far towards the end of the alphabet to make that point. <br />ALAMEDA:Okay. With that note. Commissioners any, any, if you had to backtrack <br />on some of those proposed changes in the conditions, feedback? Okay, Mr. Lim continue. <br />LIM:Okay Ill go through and really quickly here. A lot of these are just <br />technical changes I think. Going onto condition number N. At the end of the sentence we would <br />like the improvements, drainage improvements to be constructed prior to the issuance of a <br />certificate of occupancy for the project. Theyre asking that the drainage improvements be <br />constructed prior to issuance of any construction permit. So, I think just common sense wise we <br />should change it to CO. On the condition O, the next one. The third sentence in there states, no <br />residential lots may be created which lack a buildable area. This restriction may be removed by <br />amendment of this ordinance by the County Council. Ive talked to the Director about this I <br />think he doesnt agree but in my mind that, I dont know what exactly that means because its <br />basically a statement of the law. The residential lots have to, have to meet a certain buildable <br />area under the zoning code but you know its up to him as to what he wants to do on that. The <br />next sentence states that a copy of the proposed covenants to be recorded with the Bureau of <br />Conveyances shall be submitted to the Planning Director for review and approval prior to the <br />issuance of Final Subdivision Approval. Id like to propose adding or Final Plan Approval, as <br />applicable. Final Subdivision Approval is usually for lots. Final Plan Approval is usually for a <br />condominium development like this. Going down to condition P on the next page, on the fifth <br />line. Basically were trying to establish compliance by the issuance of the Certificate of <br />ththth <br />occupancy on both the 5 line and 10 line. And on the 9 line which says that the <br />improvements, it states a list of improvements. I think we should say that the hazard barrier <br />fencing,andshallbecompletedpriortotheissuanceofanyCertificateofoccupancy.That <br />would give us a very consistent deadline for completing everything. <br />ALAMEDA:Director? <br />EXHIBIT B <br />17 <br /> <br />