My WebLink
|
Help
|
About
|
Sign Out
Home
2005-12-08 TLava Kuakini
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-12-08 TLava Kuakini
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:17:31 PM
Creation date
6/14/2011 4:17:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
YUEN:I didnt quite understand that. <br />EMLER:Okay, the condition change by the applicant says the TIAR shall include a <br />schedule improvements describing when each improvement will be required in development of <br />the project. But, if you look at the conditions for improving Kuakini Highway and I need to <br />point out which condition that is. <br />ALAMEDA:Thatd be H. <br />EMLER:Okay. <br />LIM:(not speaking inmike) I guess I can see what Mr. Emler is saying <br />(inaudible) modified to enable the applicant to close Certificate of Occupancy for the portion of <br />theprojectthatsrelevanttothoseroadwayimprovementssothatwedonthaveto,wewont, <br />otherwise we wont be able to pull a CO for the, for any portion of the project until all of the <br />improvements are done. <br />ALAMEDA:Director? <br />YUEN:Right, the, we can work on the exact wording of this but the basic idea is <br />that for, the improvements to the intersection can be done in phases that the improvements have <br />to be completed before certificate of occupancy is issued for that phase of the project. What, the <br />idea that the TIAR contain suggested phasing is also okay with me. But, what I want to make, I <br />want this to be written in a way that makes it clear that any phasing of improvements has to be <br />approved by DPW and not-. The wording that is in Mr. Lims condition suggests that the TIAR <br />determines the phasing and so, and so Mr. Lim says that, the, well DPW can reject the TIAR. <br />But, I look at the TIAR as more of a technical document and, and so the TIAR may say well 50 <br />units does not warrant a left-turn pocket whereas I look at that decision as more of policy. And <br />the TIAR will tell you your typical delay with somebody wanting to turn left will be 15 seconds <br />or something. And, thats the technical part and to me the decision of whether, when you have a <br />left turn pocket is partially technical but also partially policy. If I understand correctly and <br />correct me if Im wrong Ki that theres not really a set, theres not a set standard that says if you <br />have to wait so many seconds you should have a left turn pocket or its-. Theres an element of <br />engineering judgment to this and Id like it to be really clear that they can approve the analysis in <br />the TIAR but and the TIAR may say well we dont think you need a left turn pocket yet but <br />Public Works thinks you do and so then youve got to put it in. I am myself leery of having any <br />significant level of development either 50 units on the property without a left turn pocket. But <br />we can, we dont have to sit here and decide that right now. As Ki, am I, am I, are we on board <br />with this? <br />EMLER:Okay. <br />ALAMEDA:Ki? <br />EXHIBIT B <br />20 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.