My WebLink
|
Help
|
About
|
Sign Out
Home
2005-12-08 TLava Kuakini
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2005
>
2005-12-08 TLava Kuakini
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2011 4:17:31 PM
Creation date
6/14/2011 4:17:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
otherwise determined by-. We can say either DPW or the Planning Director. I think weve <br />typically said DPW so I put it that way. Its, you tell me at that point. <br />EMLER:Yes, Im fine with that, leave it at that. <br />YUEN:Leaving it with DPW or? <br />EMLER:Just leave in the requirement. <br />YUEN:Leaving it required but then who has the authorization to, to waive it? I <br />think we should have some authorization to waive the requirement based on phasing. <br />EMLER:To me thats just exactly what hes asking for. <br />LIM:Yeah,allwereaskingforisifwecanprovetoDPWthattheneedofthe <br />plans of that phase of the project doesnt need, doesnt generate the need for this big intersection <br />that wed be allowed to keep it as is until such time as we trigger it. And, theyll control that, we <br />agree that they control it. <br />YUEN:Okay. Well, Ill work, Ill write this up that way. <br />ALAMEDA:Very good. Mr. Emler continue. <br />EMLER:Okay Im going to go ahead and cover some other changes too at the same <br />time that the applicant didnt call for. So on condition F, going right into condition F. We asked <br />to have this no vehicular security gate amendment made to the original conditions, the one thats <br />underlined here in condition F on the Planning Departments copy. However, the last sentence, a <br />vehicular turnaround shall be provided within the project property on the egress, and Im going <br />to add the word side in there, of any such gate. <br />SIRACUSA:Excuse. <br />ALAMEDA:Commissioner Siracusa? <br />SIRACUSA:How would that read then? <br />EMLER:Okay, it would read, A vehicular turnaround shall be provided within the <br />property-. Excuse me. A vehicular turnaround shall be provided within the project property on <br />the ingress side of any such gate. <br />ALAMEDA:Commissioner Watanabe? <br />WATANABE:I got a question. So thats, that mean that where you have that gate you <br />would, it would, youd have a pocket there right before the gate so that people could turn <br />around? <br />EXHIBIT B <br />22 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.