Laserfiche WebLink
approval have been complied with and the Planning Director acknowledges that <br /> further reports are not required. <br /> [4-2]17. [n., oxte s o of time fa-rhorer-fa-:„a o f a ,a;to s , ;rh;., rhor w,;tMay b <br /> g to ham, rho nlafi ifig Difeetar the f llo ; g eirettfflstafl ) rho flan <br /> the the Cielle•-a Pizcode;-e) •,t.,g of nce iffl, a-c ,,1d flat <br /> forper-fbflxn afl acea�a eandition to beper-fefill'a ` ;rh;•, `•e�e�ceadea <br /> to One zttit-ti��tt't e-, shah, a any of rho .,.bons not be met . <br /> .]An extension of time for the performance of <br /> conditions within the permit may be granted by the Director upon the following <br /> circumstances: <br /> a) The non-performance is the result of conditions that could not have <br /> been foreseen or are beyond the control of the applicant, <br /> successors or assigns, and that are not the result of their fault or <br /> negligence. <br /> b) Granting of the time extension would not be contrary to the <br /> General Plan or Zoning Code. <br /> c) Granting of the time extension would not be contrary to the <br /> original reasons for the granting of the permit. <br /> d) The time extension shall be for a period not to exceed the period <br /> originally granted for performance (i.e., a condition to be <br /> performed within one year may be extended for up to one <br /> additional year). <br /> -13- <br />