My WebLink
|
Help
|
About
|
Sign Out
Home
Petitioner ʻIewe Hanau O Ka Ainaʻs Reply in Support of its First Amended Petition
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-06 Windward Special Meeting
>
(PL-CCH-2024-024) 'Iewe Hanau O Ka 'Aina
>
Petitioner ʻIewe Hanau O Ka Ainaʻs Reply in Support of its First Amended Petition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 11:26:33 AM
Creation date
5/3/2024 12:00:59 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/3/2024
Description
ʻIewe Hanau O Ka Ainaʻs Reply Intervention
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
44;:, AQUA ENGINEERS <br /> AN EMPLOYEE OWNED COMPANY <br /> b. Pumpstation Listin>; <br /> Effective Remaining <br /> Equipment Description Service Life Service Life <br /> Pumps 15 <br /> Motors 10 <br /> Control Panel 15 <br /> Portable Generator 7 <br /> Housing 20 <br /> Alarm Sys/Level Control 20 - <br /> Complete Replacement 56 20 <br /> c. Water System Listing <br /> Effective Remaining <br /> Equipment Description Service Life Service Life <br /> Building 56 20 <br /> Building Doors 10 - <br /> Chlorine metering punp 15 2 <br /> Eye Wash Station 40 4 <br /> Fencing 1 39 3 <br /> Fence Gate 20 - <br /> MCC Panel main 39 3 <br /> Generator 30 - <br /> Generator ATS 30 <br /> Well Pump 30 <br /> Well Pump ValveslRiping 25 <br /> Flow meter 20 <br /> Pressure Sensor 6 <br /> Chlorine Booster Pump 15 <br /> Tank 30 - <br /> Tank Ladder/Railing 46 10 <br /> Gratin 10 - <br /> Tank Access Cover 41 5 <br /> Sample Point Raping 10 <br /> Fre Hydrants 35 <br /> Water Meters 19 - <br /> 16"Distribution Raping 86 50 <br /> 12"Distribution Raping 86 50 <br /> 12"Isolation Valves 12 total 86 50 <br /> 9Page <br /> Exhibit A <br /> Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.