Laserfiche WebLink
Ao,� AQUA ENGINEERS <br /> AN EMPLOYEE OWNED COMPANY <br /> 9. Capital Improvements for years 1—3 <br /> Ownership will be processing new entitlements over the next 3 years, and the planned <br /> improvements and repairs being planned will need to be consistent with such entitlements. <br /> Potable Water System Justification <br /> Upgrade wiring and install soft Existing well motor does not have soft starters. This <br /> starter for 100 horsepower motor for creates a higher amperage demand charge during <br /> Well A. daily start-ups. Not having soft starters also shortens <br /> the useful life of motor. <br /> Replace 21 water meters with Badger Replacing the meters will improve accuracy in the <br /> M25 positive displacement meters monthly meter reading consumption report. <br /> Replace motor control center and Building contains high voltage, Replacement will <br /> chlorine pump room doors and provide security from trespassers, rodents, and the <br /> ventilation louvers. weather. Doors are beyond repair. <br /> Replace chain link fencing as needed Provide security for facility. <br /> and replace entrance gate <br /> Install SCADA monitoring system at SCADA system will provide 24-hour monitoring of the <br /> million-gallon tank and potable well tank height and provide a more efficient pumping <br /> site. operation. <br /> Replace existing 16" x 12"flow tube Meter does not work; daily pumping totals are <br /> and totalizer. calculated by multiplying the run time hours by the <br /> estimated pumping rate of 730 gallons per minute. <br /> Increase reported pumping accuracy. <br /> Wastewater System Justification <br /> Install effluent meter at treatment Effluent flow meters are required by the Department <br /> plant. of Health at all wastewater treatment facilities. <br /> Install SCADA monitoring system at SCADA system will provide 24 hours monitoring of wet <br /> wastewater pump station. well height and alarms for high and low levels. <br /> Replace pump at wastewater pump Existing Pump is failing. New pump will be able to <br /> station with a new 7.5 hp Barnes pump more waste in less time which will decrease the <br /> grinder pump. Replace wiring in daily run time.This will result in lower electrical cost <br /> panel as needed to provide for water and lessens the chance of a wastewater spill. <br /> seal alarms. <br /> 101Page <br /> Exhibit A <br /> Page 10 of 12 <br />