My WebLink
|
Help
|
About
|
Sign Out
Home
Petitioner ʻIewe Hanau O Ka Ainaʻs Reply in Support of its First Amended Petition
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-06 Windward Special Meeting
>
(PL-CCH-2024-024) 'Iewe Hanau O Ka 'Aina
>
Petitioner ʻIewe Hanau O Ka Ainaʻs Reply in Support of its First Amended Petition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 11:26:33 AM
Creation date
5/3/2024 12:00:59 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/3/2024
Description
ʻIewe Hanau O Ka Ainaʻs Reply Intervention
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ao,� AQUA ENGINEERS <br /> AN EMPLOYEE OWNED COMPANY <br /> 9. Capital Improvements for years 1—3 <br /> Ownership will be processing new entitlements over the next 3 years, and the planned <br /> improvements and repairs being planned will need to be consistent with such entitlements. <br /> Potable Water System Justification <br /> Upgrade wiring and install soft Existing well motor does not have soft starters. This <br /> starter for 100 horsepower motor for creates a higher amperage demand charge during <br /> Well A. daily start-ups. Not having soft starters also shortens <br /> the useful life of motor. <br /> Replace 21 water meters with Badger Replacing the meters will improve accuracy in the <br /> M25 positive displacement meters monthly meter reading consumption report. <br /> Replace motor control center and Building contains high voltage, Replacement will <br /> chlorine pump room doors and provide security from trespassers, rodents, and the <br /> ventilation louvers. weather. Doors are beyond repair. <br /> Replace chain link fencing as needed Provide security for facility. <br /> and replace entrance gate <br /> Install SCADA monitoring system at SCADA system will provide 24-hour monitoring of the <br /> million-gallon tank and potable well tank height and provide a more efficient pumping <br /> site. operation. <br /> Replace existing 16" x 12"flow tube Meter does not work; daily pumping totals are <br /> and totalizer. calculated by multiplying the run time hours by the <br /> estimated pumping rate of 730 gallons per minute. <br /> Increase reported pumping accuracy. <br /> Wastewater System Justification <br /> Install effluent meter at treatment Effluent flow meters are required by the Department <br /> plant. of Health at all wastewater treatment facilities. <br /> Install SCADA monitoring system at SCADA system will provide 24 hours monitoring of wet <br /> wastewater pump station. well height and alarms for high and low levels. <br /> Replace pump at wastewater pump Existing Pump is failing. New pump will be able to <br /> station with a new 7.5 hp Barnes pump more waste in less time which will decrease the <br /> grinder pump. Replace wiring in daily run time.This will result in lower electrical cost <br /> panel as needed to provide for water and lessens the chance of a wastewater spill. <br /> seal alarms. <br /> 101Page <br /> Exhibit A <br /> Page 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.