My WebLink
|
Help
|
About
|
Sign Out
Home
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (3_8.03.2023)_v1
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (3_8.03.2023)_v1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 8:53:03 PM
Creation date
3/14/2024 8:39:51 PM
Metadata
Fields
Template:
Plan Doc Template
Permit Number
PL-USE-2023-000018
Parcel Number
680020560000
Description
Waikoloa Lutheran Church Use Permit Application Packet_FINAL (3_8.03.2023)_v1 - OKD - Application package
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Management Area Rules and regulations. Specifically: <br /> A. The proposed project will not have any substantial, adverse environmental <br /> or ecological effect. Any effect that may result will be minimized to the <br /> extent practicable an is clearly outweighed by public health, safety and <br /> welfare, and other compelling public interest. <br /> Further, it will not generate any adverse effects by themselves or in <br /> conjunction with other individual developments, the potential cumulative <br /> impacts of which would result in a substantial adverse environmental or <br /> ecological effect and the elimination of planning options. Appropriate <br /> mitigative measures will be taken to address any potential adverse impacts <br /> of this project. <br /> B. The proposed activities — as discussed earlier — are consistent with the <br /> objectives,policies and guidelines of the SMA Rules and Regulations. <br /> C. The proposed activities are consistent with the County General Plan and <br /> County Zoning Code, as noted in Chapter VIII-A of this document. <br /> F. Other Permitting Considerations <br /> If the Use Permit is approved, other ministerial permits are still required. These <br /> may include Plan Approval and certainly Building Permit, and others construction <br /> related permits. Then, too, other permits and/or data may be required to comply <br /> with any conditions of approval of the Use Permit. <br /> V. INFRAESTRUCTURE CONSIDERATIONS <br /> A. Water <br /> Water is supplied to the property by Hawaii Water Service who is a private utility <br /> company. It is anticipated that the proposed church would need no more than <br /> 1800 gallons or 6 units of water on its peak day, which is Sunday. The rest of the <br /> week would probably average no more than the standard maximum of six <br /> hundred (600) gallons per day or one (1) unit of water. <br /> The requirements of the Department of Water Supply relative to water <br /> commitments, meter size, facilities charge, and the like, if appropriate, will be <br /> complied with prior to issuance of an occupancy permit for the project. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.