My WebLink
|
Help
|
About
|
Sign Out
Home
USE PERMIT 99 (92_001)_v1
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
USE PERMIT 99 (92_001)_v1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 9:13:30 PM
Creation date
3/14/2024 9:11:08 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
10/4/2016
Related Permits
680020560000
Permit Number
PL-USE-2024-000024
Parcel Number
680020310000
Description
USE PERMIT 99 (92_001)_v1- PL-Other supporting documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Fritz Harris-Glade, AIA <br /> FHG Architects AIA <br /> Page 2 <br /> 3. Construction of Phase I shall commence(building permit)within one year from <br /> the date of receipt for Final Plan Approval and shall be completed within two <br /> years thereafter(certificate of occupancy). <br /> 4. Final Plan Approval for the remainder of the development and related <br /> improvements shall be secured from the Planning Department within two(2) <br /> years from the effective date of this amendment. To assure adequate time for plan <br /> approval review and in accordance with Chapter 25-2-72 (Zoning Code),plans <br /> shall be submitted a minimum of forty-five days prior to the date by which plan <br /> approval must be secured. Detailed landscaping, parking,and interior traffic <br /> circulation patterns shall be included on plans submitted. <br /> 5. Construction of the remainder of the development shall be completed(certificate <br /> of occupancy)within five years from the effective date of this amendment. <br /> 6. The applicant shall prepare and submit a drainage study of the subject property for <br /> the review and approval by the Department of Public Works. The applicant shall <br /> provide all drainage improvements as may be required by the Department of <br /> Public Works prior to the issuance of a certificate of occupancy of the proposed <br /> development. <br /> 7. Access to the project site, including adequate sight distance, shall meet with the <br /> approval of the Department of Public Works prior to the issuance of a certificate <br /> of occupancy for any structure in Phase I. The applicant shall also restripe that <br /> portion of Paniolo Drive in the vicinity of the subject property to include a left <br /> turn lane at a time to be determined by and in the manner meeting with the <br /> approval of the Department of Public Works. <br /> 8. Curb, gutter and sidewalk improvements shall be installed in two phases. The <br /> first phase of curb, gutter and sidewalk installation shall include the property <br /> frontage beginning at the northern boundary of the property to and including any <br /> access points and be completed prior to the issuance of a certificate of occupancy <br /> for Phase I of the development. The second phase of curb, gutter and sidewalk <br /> installation shall include the remainder of the property frontage and be completed <br /> prior to December 31, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.