My WebLink
|
Help
|
About
|
Sign Out
Home
USE PERMIT 99 (92_001)_v1
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
USE PERMIT 99 (92_001)_v1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 9:13:30 PM
Creation date
3/14/2024 9:11:08 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
10/4/2016
Related Permits
680020560000
Permit Number
PL-USE-2024-000024
Parcel Number
680020310000
Description
USE PERMIT 99 (92_001)_v1- PL-Other supporting documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Fritz Harris-Glade,AIA <br /> FHG Architects AIA <br /> Page 3 <br /> 9. Should any unidentified sites or remains such as artifacts, shell, bone, or charcoal <br /> deposits,human burials, rock or coral alignments,pavings or walks be <br /> encountered, work in the immediate area shall cease and the Planning Department <br /> shall be immediately notified. Subsequent work shall proceed upon an <br /> archaeological clearance from the Planning Department when it finds that <br /> sufficient mitigative measures have been taken. <br /> 10. The applicant shall comply with all applicable County, State and Federal laws, <br /> rules,regulations and requirements. <br /> 11. An annual progress report shall be submitted to the Planning Director prior to the <br /> anniversary date of the approval of this amendment. The report shall include,but <br /> not be limited to,the status of the development and to what extent the conditions <br /> of approval are being complied with. This condition shall remain in effect until <br /> all of the conditions of approval have been complied and the Planning Director <br /> acknowledges that further reports are not required. <br /> 12. An extension of time for the performance of conditions within the permit may be <br /> granted by the Planning Director upon the following circumstances: <br /> a) The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicant, successors or assigns, <br /> and that are not the result or their fault or negligence. <br /> b) Granting of the time extension would not be contrary to the General Plan <br /> or Zoning Code. <br /> c) Granting of the time extension would not be contrary to the original <br /> reasons for granting of the permit. <br /> d) The time extension granted shall be for a period not to exceed the period <br /> originally granted for performance(i.e., a condition to be performed within <br /> one year may be extended for up to one additional year). <br /> e) If the applicant should require an additional extension of time, the <br /> applicant shall submit its request to the Planning Commission for <br /> appropriate action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.