My WebLink
|
Help
|
About
|
Sign Out
Home
COR-17-109840(PLA)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
6-8-002:031
>
PLA-17-001397
>
COR-17-109840(PLA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 9:44:08 PM
Creation date
3/28/2017 3:45:22 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
2/10/2017
Permit Number
COR-17-109840
Parcel Number
680020310000
Description
680020310000, APPLICATION FOR PLAN APPROVAL, AUTHORIZATION LETTER, TAX CLEARANCE, DRAINAGE REPORT, SITE PLANS, WAIKOLOA BAPTIST CHURCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I: rainfall intensity in inches per hour for a duration equal to the time of concentration <br /> (see Appendix C for NOAH Precipitation Frequency Estimate;and Appendix C Plate 3 <br /> for Time of Concentration Calculations): <br /> 10-year storm: I= 1.5 inch/hour <br /> A: drainage area in acres <br /> 5 CONCLUSION <br /> The drainage concept is premised on zero increase in runoff from the project. For the <br /> existing condition,the calculated rainfall runoff is 9.71 cfs. When all proposed improvements are <br /> completed,the calculated rainfall runoff is 24.05 cfs. Rainfall runoff will be directed towards drain <br /> sumps,with each drain sump having a 2 cfs capacity;therefore,8 drain sumps are required to <br /> dissipate the 14.35 cfs net increase in rainfall runoff. Conceptual locations of these 8 drain sumps <br /> are shown on Appendix A Figure 3;and a drain sump detail is provided in Appendix A Figure 4. <br /> Waikoloa Baptist Church Page 3 of 3 <br /> Drainage Report for Plan Approval November 2016 <br /> ©2016 Belt Collins Hawaii LLC M:\Waikoloa Baptist Church\2016332400\05 Basis of Design\Reports\Drainage <br />
The URL can be used to link to this page
Your browser does not support the video tag.