My WebLink
|
Help
|
About
|
Sign Out
Home
COR-17-109840(PLA)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-05-22 Leeward
>
Item #2 Waikoloa Lutheran Church/Erick Jacobson (PL-USE-2023-000018)
>
PL-USE-2023-000018
>
6-8-002:056
>
PL-USE-2024-000024
>
6-8-002:031
>
PLA-17-001397
>
COR-17-109840(PLA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2019 9:44:08 PM
Creation date
3/28/2017 3:45:22 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
2/10/2017
Permit Number
COR-17-109840
Parcel Number
680020310000
Description
680020310000, APPLICATION FOR PLAN APPROVAL, AUTHORIZATION LETTER, TAX CLEARANCE, DRAINAGE REPORT, SITE PLANS, WAIKOLOA BAPTIST CHURCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 METHODOLOGY <br /> Reference: "STORM DRAINAGE STANDARDS,Department of Public Works,County of Hawaii". <br /> October 1970. Applicable Plates and Table are provided in Appendix C. <br /> US Department of Agriculture,Natural Resources Conservation Service Web Soil <br /> Survey.http://websoilsurvey.nres.usda.gov/app/WebSoilSurvey.aspx <br /> US Department of Agriculture,Soil Conservation Service,"Erosion and Sediment <br /> Control Guide for Hawai'i",dated March 1981,as amended <br /> US Department of Commerce,National Oceanic and Atmospheric Administration <br /> (NOAA) Precipitation Frequency Estimates <br /> http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_hi.html <br /> Design Criteria: <br /> Recurrence Interval(Tm): Tm=10 years <br /> Runoff Quantity: Since the project area is less than 100 acres,runoff was calculated using the <br /> rational method. <br /> Rational Method(Q=cIA): <br /> Q: runoff quantity or flow rate in cubic feet per second (see Appendix B - Table 1 for <br /> runoff calculations); <br /> c: runoff coefficient: <br /> Building: 1.00 <br /> AC pavement: 0.90 <br /> Existing/disturbed land: 0.32 <br /> Infiltration(medium) = 0.07 <br /> Relief(rolling 5-15%) = 0.03 <br /> Vegetal cover(none) = 0.07 <br /> Development type(agricultural) = 0.15 <br /> Landscaped area: 0.25 <br /> Infiltration(medium) = 0.07 <br /> Relief(rolling 5-15%) = 0.03 <br /> Vegetal cover(high) = 0.00 <br /> Development type(agricultural) = 0.15 <br /> Waikoloa Baptist Church Page 2 of 3 <br /> Drainage Report for Plan Approval November 2016 <br /> 2016 Belt Collins Hawaii LLC M:\Waikoloa Baptist Church\2016332400\05 Basis of Design\Reports\Drainage <br />
The URL can be used to link to this page
Your browser does not support the video tag.