My WebLink
|
Help
|
About
|
Sign Out
Home
2024-03-04 Letter AOAO of Colony 1 at Sea Mountain, Anthony Gand (PL-CCH-2024-022)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-08-01 Windward
>
Item #1 AOAO of Colony 1 at Sea Mountain (PL-CCH-2024-022)
>
2024-03-04 Letter AOAO of Colony 1 at Sea Mountain, Anthony Gand (PL-CCH-2024-022)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 10:00:40 AM
Creation date
7/9/2024 9:43:00 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/4/2024
Related Permits
PL-SMA-2023-000046
Other Parcel Numbers
950190150000, 950190240000, 950190260000, 950190300000, 950190310000, 950190330000, 950190350000, 960010010003, 960010010003, 960010060000, 960010110013, 960020080000, 960020370000, 960020380000,
Permit Number
PL-CCH-2024-000022
Parcel Number
950190110000
Description
Letter acknowledge receipt of petition
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
those agencies. It should also include other emergency contacts for materials, equipment, <br /> supplies, and contractors. <br /> 2. Has PWS secured a generator or generators to provide backup power for the potable water <br /> well, wastewater pumping station, and wastewater treatment facility? If so, has a working <br /> electrical connection and switch been installed and fueling needs considered? <br /> 3. Has PWS (or a contractor) surveyed the condition of the primary well (potable) and its <br /> appurtenances and created a list of spare parts to be inventoried? <br /> 4. Has PWS (or a contractor) surveyed the condition of the secondary well (inoperative and <br /> non-potable) to ascertain the possibility of it being certified for potable use and acting as a <br /> backup in the event the primary well fails? <br /> 5. Has PWS performed a lost water audit on the potable water system (pre treatment and in the <br /> distribution system)? <br /> 6. Has PWS investigated the leaks in the water storage tank along with their specific cause(s) <br /> and repair needs? <br /> 7. Has PWS developed a repair or replacement plan for the fire hydrants and determined if <br /> adequate supply and flow rates are available for each hydrant? Have inoperative or damaged <br /> hydrants been clearly marked as such and the Fire Department notified? <br /> 8. Has PWS developed a plan to repair or replace critical parts at the waste water pumping <br /> station? <br /> 9. Has PWS performed a lost wastewater audit on the wastewater system? <br /> 10. Has PWS (or a contractor) surveyed and assessed the wastewater treatment plant for <br /> reliability and effectiveness? <br /> 11. Has PWS identified and addressed all areas of concern outlined by the reports on both <br /> systems generated by Aqua Engineers and submitted to the PUC? <br /> 12. Is PWS currently in compliance with all State and Federal testing requirements? <br /> 13. Is PWS currently in compliance with all reporting requirements? <br /> Thank you for your valuable time and prompt attention to this matter. <br /> Mahalo nui Ioa, <br />
The URL can be used to link to this page
Your browser does not support the video tag.