Laserfiche WebLink
E. Resumes of Key Personnel Proposed for this Contract <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> a.Total b.With Current Firm <br /> Simone Simbeck Senior Environmental Scientist/GIS 17 6 <br /> 15. FIRM NAME AND LOCATION(CITY AND STATE) <br /> Haley&Aldrich,Inc., Honolulu, HI <br /> .EGREE AND SPECIALIZATION) 17. CURRENT PR(1FFCCI(1NAI RFGICTRATION(CTATF AND nICCIPLINE) <br /> BS, Environmental Science CORMIX Mixing Zone Model Certificate; ISO 14001 <br /> Geographic Information Systems(GIS)Certificate Environmental Management System (EMS) Certificate <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.) <br /> Qualifications:Senior environmental consultant and project manager with over 14 years of experience in Environmental <br /> Monitoring,Compliance and Storm Water Management, Impact Assessment, Instrumentation,and GIS.Valuable skills in <br /> regulatory compliance and reporting. Simone has worked on projects as a consultant for local government and private entities in <br /> Hawaii, U.S. Mainland, New Zealand,and New Caledonia. <br /> 19. RELEVANT PROJECTS <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Environmental Engineering and Compliance Support,Statewide Professional Services Construction(If Applicable) <br /> Airports, Multiple Islands, HI Ongoing N/A <br /> (3)Brief Description(Brief S ize,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> a Project Manager for DOT's Airport Environmental compliance program at 15 airports statewide by providing education, <br /> training, inspections, recommendations for program improvements,and reporting. Project requires updating SPCC, NPDES <br /> and UIC permit documents; reviewing airport construction documents for compliance with DOTA's environmental <br /> requirements; conducting construction, underground injection control well and tenant BMP inspections;stormwater <br /> sampling and assisting with special projects and upgrades. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> MS4 NPDES Permit Program Management Professional Services Construction(If Applicable) <br /> Maui, HI Ongoing N/A <br /> b (3 'f Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> GIS Manager for the County's Storm Water Management Program. Managed GIS survey of the County's stormwater <br /> infrastructure in several areas of Maui. Project included field data gathering,digitization of historic plan files,and <br /> coordinating data delivery and GIS platform datasets. <br /> (1)Title and Location(City and State) <br /> Anderson Real Estate Water Quality Studies and Compliance Support, Professional Services Construction(If Applicable) <br /> Oahu, HI Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> c <br /> Project Manager providing compliance services for Topa's National NPDES permit to discharge once-through non-contact <br /> cooling water to Honolulu Harbor.The project involves quarterly and annual sampling and reporting events. Simone designed <br /> a program to demonstrate the exceedances of water quality standards at the receiving waters were not attributable to Topa, <br /> but to storm water drainage that discharges at the same outfall. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> EIS PVT Integrated Solid Waste Management Facility Professional Services Construction(If Applicable) <br /> d <br /> Oahu, HI 2020 N/A <br /> f DP«ription(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> Author/GIS on two EISs for PVT. She authored various HRS Ch. 343 EIS resource sections, prepared GIS figures,and peer <br /> reviewed resource sections.She responded to public comments and supported the land use permit application processes. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Phase I,Phase II Environmental Site Assessments,Department of Professional Services Construction(If Applicable) <br /> e <br /> Hawaiian Home Lands(DHHL),O'ahu,HI 2017 N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> Project Manager/Environmental Scientist who designed the sampling strategy,collected soil samples for analysis, prepared <br /> GIS figures and authored sections of the reports. <br /> STANDARD FORM 330(REV.8/2016) <br /> ALDRICH <br />