Laserfiche WebLink
E. Resumes of Key Personnel Proposed for this Contract <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> a.Total b.With Current Firm <br /> Mikki Slentz,PE Civil/Environmental Engineer 13 5 <br /> 15. FIRM NAME AND LOCATION(CITY AND STATE) <br /> Haley&Aldrich,Inc., Makawao, HI <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> BS,Civil Engineering Professional Engineer—HI,CA <br /> Certified Professional in Erosion &Sediment Control (CPESC) <br /> OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,I <br /> Qualifications: Mikki's environmental and civil engineering experience includes compliance with and management of MS4 and <br /> stormwater programs as well as managing multi-million-dollar CIP and federal aid projects involving stormwater, roadway, <br /> drainage system,and flood control. Mikki formerly worked for County of Maui as an engineer in the DPW Engineering Section, <br /> where she managed roadway-and drainage-related projects,giving her valuable experience in County procedures and processes. <br /> 19. RELEVANT PROJECTS <br /> (1)Title and Location(City and State) (2)Year Completed <br /> MS4 NPDES Permit Program Management Professional Services Construction(If Applicable) <br /> Maui, HI Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Spec' ®Check If Project Performed With Current Firm <br /> a Project Manager for the County's Storm Water Management Program. Managed Storm Water Management Program <br /> implementation,including public outreach and engagement,construction,and post-construction best management practices <br /> (BMP),illicit discharge detection and elimination program,GIS survey of the County's MS4,County facility inspections and <br /> personnel training,and consultation regarding program organization and funding. <br /> (1)Title and Location(City and State) Completed <br /> 'Tao Flood Control Systemwide Improvement Framework Professional Services Construction(If Applicable) <br /> Maui,HI Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> b Project Engineer managing the development of a SWIF document under the Army Corps of Engineers'program to correct <br /> deficiencies related to encroachments and levees that are part of the Flood Control Project(FCP),maintained by the County of <br /> Maui. Project includes research of FCP plans and drawings, records of past inspection logs,correspondence with landowners and <br /> County personnel,and land documents,and preparation of the SWIF document.The SWIF document describes the County's <br /> proposed FCP improvements and includes a plan of action and schedule and is under review by the Army Corps. <br /> (1)Title and Location(City and State) <br /> Environmental Engineering and Compliance Support,Statewide Airports Professional Services Construction(If Applicable) <br /> Multiple Islands, HI Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> Project Engineer supporting this comprehensive program providing DOT with "as-needed"environmental engineering and <br /> c compliance support at 15 State airports. Reviews construction design plans and inspects construction sites for compliance with <br /> storm water regulations.Trained DOT personnel on Spill Prevention Control and Countermeasure(SPCC) Plans, Industrial Storm <br /> Water Pollution Prevention Plans(SWPPPs),and general pollution prevention. Prepared and updated SPCC Plans for DOT <br /> facilities. Instrumental in preparing the MS4 Stormwater Management Plan and MS4 permit renewal for two State airports. <br /> Reviewed construction plans for compliance with best management practice(BMP)requirements. Provided management and <br /> technical support for construction BMP inspection team tasked with inspecting construction projects at State airports. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> West Maui Recycled Water Expansion Phase 2 NPDES Permitting Professional Services Construction(If Applicable) <br /> d <br /> Maui, HI 2023 2023 <br /> ®Check If Project Performed With Current Firm <br /> Project Manager for the preparation of the contractor's dewatering permit for deep excavations associated with the project. <br /> Consultation included water sampling and preparing the project's NPDES permit application. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Lahaina Stormwater Best Management Practices(BMP)Design Professional Services Construction(If Applicable) <br /> Maui, HI Ongoing N/A <br /> (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ®Check If Project Performed With Current Firm <br /> e Project manager in charge of developing swift and effective best management practice(BMP) implementation to quickly <br /> mitigate polluted runoff that could threaten coral reefs and other aquatic resources following the devastating wildfire in Lahaina, <br /> Hawai'i. Implementing BMPs following the Lahaina wildfire involved rapid response to protect sensitive environmental and <br /> cultural resources,which required coordinated action,communication,and cross-disciplinary collaboration. <br /> STANDARD FORM 330(REV.8/2016) <br /> HREBI;ICH <br />