Laserfiche WebLink
Fiscal Year 2024-2025 I PL.3) COMMUNITY PLANNING <br /> (Community Planning Assistant: Project Management Support,Community <br /> International Organizing, Public Participation, Meeting Facilitation) <br /> LIST OF REPRESENTATIVE RECENT PROJECTS <br /> Page 5 <br /> COMMUNITY PLANNING PROJECT EXPERIENCE <br /> FY18 Tinian Construction Capacity Study(TCCS) <br /> Tinian, Commonwealth of the Northern Mariana Islands (CNMI) <br /> SSFM provided a comprehensive analysis of the infrastructure and <br /> resources requirements to support Department of Defense <br /> construction activities on the island of Tinian, CNMI. The project <br /> -- team developed a methodology to produce recommendations <br /> - based on a systematic approach in analyzing resources and <br /> limitations to each technical discipline. The purpose of the TCCS <br /> was to assist DoD in making informed planning and programming <br /> decisions for future DoD construction on Tinian. <br /> -- Cost: $1.23 million (fees) <br /> Climate Change Adaptation Study <br /> CA F6k+w 0.eiww,- Island of Oahu, Hawaii <br /> Climale Adaptation <br /> DESIGN PRINCIPLES SSFM provided planning services for development of the County's <br /> FOR URBAN DEVELOPMENT TOD Climate Change Adaptation Guidelines including Data <br /> Collection and Outreach, and Infrastructure Planning. <br /> Ilk s The purpose of this project was two-fold: 1) to outline design <br /> FI, principles that can be used to help develop policy and regulations <br /> for property in Honolulu's transit-oriented development (TOD) and <br /> other urban areas that may be vulnerable to sea level rise (SLR) <br /> W4m` 11' . - and other climate change-related hazards; and 2) to provide <br /> w � ", developers and design professionals with preliminary guidance and <br /> information to consult when developing new project applications, or <br /> 1 — when considering adaptation options for existing projects. <br /> Estimated Construction Cost: $34,000 (fees) <br /> Waiawa Correctional Facility Plan Review Use and Special Use <br /> Permits,Waipahu, Hawaii <br /> , err SSFM prepared an Environmental Assessment, researched and <br /> e .» M completed the necessary requirements of applications for the <br /> Special Use Permit (SUP) and Plan Review Use (PRU) required to <br /> bring this Facility into compliance with the Land Use Ordinance <br /> (LUO). <br /> Cost: $334,534 (fees) <br /> _,m.. .._,---- Biological Control Containment Facility <br /> Various Locations, Hawaii <br /> SSFM provided a comprehensive planning document for a <br /> proposed new Department of Agriculture, Biological Control <br /> Containment Facility on Oahu. SSFM also prepared a project <br /> development report (PDR) and rough order of magnitude <br /> Ili`, m7 " — construction cost estimate. The PDR included Land Area <br /> Requirements, Building Area Requirements, and Applicable <br /> _ ,_ ^ Regulations. It also included a Site List with available State-owned <br />