|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> A.TOTAL B.VV1TH CURRENT FIRM
<br /> Mark Hofferbert,PE Senior Project Manager
<br /> 39 31
<br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> MS,Civil Engineering Professional Engineer:#PE-15964(Hawaii, Civil)
<br /> BA,Anthropology Professional Engineer:#077870(New York, Civil)
<br /> AA,Civil Engineering
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Mark Hofferbert has 39 years of experience in environmental engineering and construction management. He has provided senior consulting
<br /> services to multiple commercial, County, State,and Federal clients throughout North America and Southeast Asia. His areas of technical expertise
<br /> include remedial investigations,feasibility studies, remedial designs,and remedial construction. Mark has specialized experience in solid and
<br /> hazardous waste management, investigation and remediation of impacted sediments,brownfields cleanups,petroleum sector consulting,and
<br /> management of former manufactured gas plant sites.
<br /> Organizations-Member of the American Society of Civil Engineers and Western Dredging Association
<br /> Training-OSHA HAZWOPER 40-Hour and 8-Hour Refresher and EPA Radon Mitigation Contractor
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> CCH,ENV,Kapaa Transfer Station Renovation PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Kailua, HI) 2022 2022
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Manager on the transfer station renovation design that increased the Refuse Division's green waste handling efficiency at the Kapaa solid
<br /> waste transfer station.AECOM managed environmental planning,and preparation of the design,specifications,and bid package for a new loadout
<br /> structure.
<br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> County of Kauai,DPW,Kekaha Landfill Cell 2 Expansion PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Kekaha, HI) 2020 2020
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Manager on the design of the lateral expansion Cell 2 of the County's only operational solid waste landfill.AECOM was responsible for
<br /> the planning,design,and permitting services for the project.
<br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> County of Kauai,DPW, New Kauai Landfill and Resource Recovery Park PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Various Locations on Kauai, HI) 2019 N/A
<br /> (3)BRIEF DESCRIPTION(Bnefscope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Manager on the$2,643,860 project that involved the preparation of an Environmental Impact Statement for the County's potential
<br /> municipal solid waste landfill and resource recovery park site.AECOM managed public outreach,agency consultation,a traffic feasibility study,a
<br /> wildlife hazard mitigation plan,detailed conceptual designs,and identified potential environmental impacts and solutions.
<br /> d. (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED
<br /> County of Kauai,DPW, New Kauai Landfill and Resource Recovery PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Various Locations on Kauai,HI) 2019 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Manager on the$2,643,860 project that involved the preparation of an Environmental Impact Statement for the County's potential
<br /> municipal solid waste landfill and resource recovery park site.AECOM managed public outreach,agency consultation,a traffic feasibility study,a
<br /> wildlife hazard mitigation plan,detailed conceptual designs,and identified potential environmental impacts and solutions.
<br /> e. (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED
<br /> County of Kauai,DPW,Storm Water Improvements at Four Refuse Transfer PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Stations (Various Locations on Kauai,HI) 2017 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Manager for conceptual planning,design,permitting,and design improvements to the storm water and leachate management systems at
<br /> the four Kauai refuse transfer stations. Evaluated site conditions,to determine compliance issues,and oversaw development of conceptual facility
<br /> design improvements.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 17
<br />
|