My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.3
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.03 - Community Planning Assistant, Project Management Support, Community Organizing, Public Participation, Meeting Facilitation
>
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:17:21 PM
Creation date
7/10/2024 3:03:01 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008092
Description
AECOM Technical Services, Inc., Professional services for category PL.3, PL.4, PL.5, PL.6, PL.9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT O <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Bayfront Intersection Improvements SERVICES (If applicable) <br /> (Hawaii Island, HI) Ongoing N/A <br /> IIIIIIIIIIIIIIII II <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> State of Hawaii Robert Sun (808)692-7578 <br /> Department of Transportation, Highways Division <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost) <br /> , Duration: �� <br /> ;,, April 2023 Ongoing <br /> '` .' .,� Size and Cost: <br /> Size:0.22 miles <br /> ,, - • ;dry AECOM Fee:$625,000 Construction:$18.4M <br /> Iiil Key Personnel: <br /> • Catherine Crawford(Program Manager) <br /> 7, , `• Courtney Hymes(Permitting Specialist) <br /> Erika Espaniola(Cultural Resource Subject Matter Expert) <br /> j Haley Cremer(Environmental Planner) <br /> •,ilw _ -,, %.10'V'.44§41N.* Technical Highlights and Challenges <br /> '' 1 4• ;. _ The improvements are intended to mitigate existingvehicular <br /> ‘,,, <br /> p 9bm' congestion at the intersection and other roadways feeding into the <br /> Hilo Bayfront Map intersection particularly during Highway closures due to flooding and <br /> address projected decreases in level of service for these roadways.The <br /> AECOM is providing professional engineering services for project will also contribute to achieving goals and objectives consistent <br /> the Hilo Bayfront Highway Intersection Improvements at with the Downtown Hilo Multimodal Master Plan(2018); State of Hawaii <br /> Waianuenue Avenue project. Bike Plan(2003)and 2045 Hawaii Statewide Transportation Plan to <br /> provide a more walkable and bike-friendly community. <br /> Project Overview <br /> The primary purpose of the project is to address traffic congestion Performance <br /> at the Hilo Bayfront Highway intersection with Waianuenue Avenue The Bayfront and Waianuenue intersection is within both DOT and <br /> caused by Highway closures due to flooding south of the intersection. County of Hawaii Right of Way.AECOM proactively engaged the <br /> The secondary purpose is to provide pedestrian accessibility and safety County in the design alternatives and incorporated feedback into the <br /> improvements. design. Early and timing coordination will help to ensure that a design <br /> that reflects both ROW owners input.The preliminary design has <br /> Scope of Work been completed within budget and schedule which has resulted in <br /> The scope of work is to evaluate geometric adjustments to the complimentary feedback from the client. <br /> intersection of Hilo Bayfront Highway/Waianuenue Avenue/ <br /> Kamehameha Avenue to improve maneuverability of large trucks and to <br /> provide pedestrian access to Kaipalaoa Landing.The Planning scope <br /> includes preparing a HRS Chapter 343 Environmental Assessment as <br /> well as various agency consultation support,which includes Chapter 6E <br /> and Section 106 of the National Historic Preservation Act as well as a <br /> County of Hawaii Special Management Area Assessment. <br /> 25. FIRMS FROM SECTION C INVOLVED VNTH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. AECOM Technical Services, Inc. Honolulu, HI Prime Consultant <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I -PAGE 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.