Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY NUMBER <br /> QUALIFICATIONS FOR THIS CONTRACT <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Sea Level Rise Impact Assessment and Mitigation Report, Naval Support Facility(NSF), SERVICES <br /> (If applicable) <br /> Diego Garcia[N6274218D1802, N4008421F4429] (British Indian Ocean Territory) 2021 -Present N/A <br /> 23.PROJECT OWNER'S IN <br /> ORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br /> NAVFAC Far East Greg Castro (046)816-7987 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY(Include scope,size,and cost) <br /> Duration: <br /> air <br /> 2021 -Present <br /> Size and Coi <br /> u, a Size:Approximately 40 miles <br /> • _ AECOM Fee:$700,000 <br /> • Justin Vandever(Project Manager) <br /> Tessa Stefanisko(Site Investigation Support) <br /> ^ .* '` Chris Stoll(GIS) <br /> Storm overwash on Diego Garcia,2021. <br /> In support of Naval Facilities Engineering Systems The scope includes: <br /> Command (NAVFAC) Far East,the Cardno-AECOM PaAsset inventory and data collection <br /> o <br /> Site investigation and personnel interviews <br /> Joint Venture(CAPJV)conducted several tasks as part - Ocean and Lagoon Flood Modeling <br /> of this Sea Level Rise Impact Assessment and Mitigation _ Combined Flood Hazard Mapping <br /> Report. - Sea Level Rise Impact Assessment <br /> Project Overview Conceptual Flood Mitigation Strategies <br /> U.S. Navy Support Facility(NSF) Diego Garcia is a Department of Technical Highlights and Challenges <br /> Defense(DOD)installation located on a low-lying coral atoll within the Challenges and Solutions: <br /> British Indian Ocean Territory(BIOT).The installation supports the Logistical and technical challenges were experienced conducting the <br /> pre-positioning of combat unit supplies and equipment ships and is a site investigation in Diego Garcia during the COVID-19 pandemic, <br /> forward operating site for the U.S.Air Force. Because of the low-lying including a requirement for a 10-day quarantine and other safety <br /> elevation of the atoll,the site has experienced coastal flooding and precautions.These challenges were overcome through project <br /> erosion impacts over the past several decades and sea level rise is management and by following all international COVID-19 safety <br /> expected to increase the frequency and intensity of flood impacts in the requirements. <br /> future. <br /> Performance: <br /> Scope of Work The study team performed both landside and in-water data collection <br /> The scope includes preparing a report to conduct an assessment of in support of the site investigation. Field notes and photos were taken <br /> how mission-critical facilities,operations,and infrastructure systems at to document existing shoreline conditions along the ocean and lagoon <br /> NSF Diego Garcia will be impacted by sea level rise.The report also shorelines of Diego Garcia.The study team conducted a building and <br /> provides site specific and installation-wide conceptual sea level rise facility investigation and conducted interviews with facility managers. <br /> mitigation recommendations and approximate costs to prepare NSF <br /> Diego Garcia for anticipated sea level rise through 2075.The intent of <br /> these recommendations is to maintain NSF Diego Garcia's ability to <br /> support the U.S. Indo-Pacific Command mission over the next 50 years. <br /> 25. FIRMS INVOLVED VNTH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a AECOM Technical Services, Inc. Honolulu, HI Prime Consultant <br /> b. Sea Engineering, Inc. Waimanalo, HI Subconsultant for Coastal Engineering <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I -PAGE 31 <br />