My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.3
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.03 - Community Planning Assistant, Project Management Support, Community Organizing, Public Participation, Meeting Facilitation
>
2024-06-28 PL-INT-2024-008092 AECOM Technical Services, Inc. Category PL.3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:17:21 PM
Creation date
7/10/2024 3:03:01 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008092
Description
AECOM Technical Services, Inc., Professional services for category PL.3, PL.4, PL.5, PL.6, PL.9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM I County of Hawaii,Planning Department,Fiscal Year 2024-2025 <br /> G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> 28. EXAMPLE PROJECTS LISTED IN <br /> 26. NAMES OF KEY 27. ROLE IN THIS SECTION F (Fill in "Example Projects Key" <br /> PERSONNEL CONTRACT section below before completing table. Place <br /> "6"under project key number for participation in <br /> (From Section E, Block 12) (From Section E, Block 13) same or similar role.) <br /> 1 2 3 4 5 6 7 8 9 10 <br /> Christopher Stoll,AICP,GISP, LEED AP Project Manager/GIS Manager • • • • • • • <br /> Kevin Butterbaugh Principal and Lead Planner • • • • • <br /> Adriane Truluck, RLA, LEED AP Client Manager • • • • • <br /> Courtney Hymes Biologist/Permitting Specialist • • • <br /> Tessa Stefanisko Environmental Planner III • <br /> Brittany Obando Senior Environmental Planner/Project Manager • • <br /> Erika Espaniola Historic Preservation Planner/Archaeologist • • • <br /> Delphine Homerowski, LEED GA Spatial Planner II • • • <br /> Haley Cremer Environmental Planner • • • <br /> Melia Waring Environmental Planner I • • <br /> Justin Vandever,PE Coastal Engineer&Climate Adaptation Specialist • <br /> Mark Hofferbert,PE Senior Project Manager <br /> 29.EXAMPLE PROJECTS KEY <br /> NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) <br /> Draft Environmental Impact Statement/Overseas Environmental <br /> 1 Bayfront Intersection Improvements 6 Impact Statement for the Commonwealth of the Northern Mariana <br /> Islands Joint Military Training[N62742-11-D-1801,TO 0002] <br /> 2 Inventory of the Oahu Railway and Land Company Kamehameha Highway, Rockfall Protection at Waimea Bay, <br /> 7 <br /> Right-of-Way Phase 2(Sunset Beach Side), RTE 83, MP 5.66-5.96 <br /> Hawaii State Park System wide Design Guidelines Pearl Harbor Naval Shipyard Dry Dock&Waterfront Production <br /> 3 with Concepts and Construction Drawings for Accessible 8 <br /> Campsite Improvements Facility EIS <br /> U.S. Naval Facilities Atlantic, Shipyard Infrastructure Optimization Program(STOP) <br /> 4 Environmental Assessment for Ambulatory Care Center, 9 Advanced Planning Studies and Area Development Plans <br /> Joint Base Pearl Harbor-Hickam <br /> 5 Statewide General Flood Control Plan Website and 10 Sea Level Rise Impact Assessment and Mitigation Study NSF <br /> GIS Portal Diego Garcia(N6274218D1802, N4008421F4429) <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021)PART I -PAGE 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.