E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) F:y r t
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Om Das, P.E., PMP Construction Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 13 3
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> B.Tech, Chemical Engineering/2008 Hawaii, Civil Engineering
<br /> M.S., Civil Engineering/2011
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Project Management Professional(PMP), OSHA 30-Hour Construction Industry Outreach, OSHA 10-Hour Construction Industry
<br /> Outreach, LEED Green Associate,
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Water Systems Upgrade at the Waikiki Aquarium for the University of PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii, Manoa Current
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Civil Engineer responsible for project management and project design, planning& permitting. Scope of project
<br /> includes design of injection well system for the discharge of water effluent from the aquarium's exhibits.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HNL NDWP IIT Mauka Extension, Daniel K. Inouye Intl Airport PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawaii 2021 2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Construction Project Manager responsible for the coordination of project work with the project stakeholders,
<br /> b.
<br /> coordination of design changes with the Owner, Designer& Contractor, inspecting Contractor's work in
<br /> accordance with the Project Documents and negotiating change orders with the Contractor. Scope of the project
<br /> included the demolition of the old Commuter Terminal and the construction of the new Inter-Island Terminal
<br /> Mauka Extension at HNL. Approximate Construction Cost was$270 Mil.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HNL HDWP Widen Taxilanes G&L Phase I, Daniel K. Inouye Intl PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Airport 2018 2018
<br /> Honolulu, Hawaii
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> c. Construction Project Manager responsible for the coordination of project work with the project stakeholders,
<br /> coordination of design changes with the Owner, Designer& Contractor, inspecting Contractor's work in
<br /> accordance with the Project Documents and negotiating change orders with the Contractor. Scope of the project
<br /> included the widening&full pavement reconstruction of Taxilanes G & L to accommodate ADG-V type aircrafts.
<br /> Approximate Construction Cost was$60 Mil.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waiahole Water System Improvements for the State of Hawaii, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Department of Agriculture 2021
<br /> Honolulu, Hawaii
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Civil Engineer responsible for project design and permitting. Scope of project included the replacement of four
<br /> irrigation siphons along the Waiahole Water System Improvements that convey irrigation water from one part of
<br /> the Island of Oahu to another for agricultural use.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lima Ola Work Force Housing Development for Kauai County PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Housing Agency 2013
<br /> e. Kauai, Hawaii
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Civil Engineer responsible for the development of an environmental assessment report, preliminary engineering
<br /> report and a water model for the project.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Force Main Condition Assessment for the Department of Design & PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Construction, City&County of Honolulu 2014
<br /> Honolulu, Hawaii
<br /> f. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Civil Engineer responsible for developing a work plan for the condition assessment of three wastewater force
<br /> mains at Kaneohe, Kailua and Halawa and documenting the findings of the condition assessment in an
<br /> engineering report.
<br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1