Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Steve Enomoto Sr. Construction Inspector a.TOTAL b.WITH CURRENT FIRM <br /> 40 1 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> A.S. Carpentry, Honolulu Community College, 1981 General Building License, Hawaii, License BC-22763-2000- <br /> 2006 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HNL Biometric Facial Recognition System, Daniel K. Inouye International PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Airport 2023 to present <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> a. Senior Construction Inspector: Project involved the construction management and inspection of biometric facial <br /> recognition system intended for implementation at all international departure gates. Construction work entailed <br /> the development of a telecommunication network extending between the international departure gates to the <br /> DOT-A, U.S. Customs and Boarder(CBP), and various airline companies' computer servers. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HNL AOA Fence Replacement, Daniel K. Inouye International Airport PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2023 to present <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Senior Construction Inspector, Airfield Radio Monitor: Project involved the architectural and general engineering <br /> b. consulting services for the design of the fence line replacement at Daniel K. Inouye International Airport. Prepare <br /> complete design, plans, specifications, drawings, cost estimates, schedules, studies, reports and other items. <br /> Perform airfield survey of existing fence line approximately 146,500 linear feet of the Airport Operations Area <br /> (AOA). <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Runway 8L Widening and Miscellaneous Improvements, Phase 2, HNL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Airport, Oahu, HI 2022-2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> c. <br /> CH2M Senior Lead Quality Assurance Inspector: Project involved rehabilitating/reconstructing approximately <br /> 8,500 lineal feet of Runway 8L-26R pavement,widening the runway from 150 feet to 200 feet, and modifying the <br /> existing edge lights and NAVAID5. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lanai Airport Reconstruct Runway 3-21 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> d. Quality Assurance Inspector: Project involved Cold milling and repaving RWY 3-21, addition of 25' shoulders on <br /> each side of runway and taxiway, construction of grouted riprap drainage swales, and rehabilitation of TWY A <br /> and the apron, including grooving the runway pavement and painting airfield markings in accordance to project <br /> specifications. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> NDWP Widen Taxilanes G& L—Phase 1, HNL Airport, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2011-2013 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Quality Assurance Inspector on $42 million project for the reconstruction of Taxilanes G&L and Taxiway A. Work <br /> e. included utility relocation and upgrades; construction of a bridge structure over the Manuwai Canal; box culvert <br /> reconstruction; reconstruction of airfield lighting and signage; and fuel line system upgrades. Construction <br /> inspection included material sampling and testing;verification of the contractor's monthly pay estimates; <br /> random sampling calculation and marking for gradation; density and thickness testing; and calculation for <br /> random sampling for core location. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Runway 8L Pavement Improvements, HNL Airport, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> f' Senior Lead Quality Assurance Inspector: Project involved rehabilitating/reconstructing approximately 8,500 <br /> lineal feet of Runway 8L-26R pavement,widening the runway from 150 feet to 200 feet, and modifying the <br /> existing edge lights and NAVAID5. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />