My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-25 PL-INT-2024-008058 Sea Engineering, Inc. Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-25 PL-INT-2024-008058 Sea Engineering, Inc. Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 2:53:25 PM
Creation date
7/10/2024 2:47:41 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/25/2024
Permit Number
PL-INT-2024-008058
Description
Sea Engineering, Inc. Professional services for category PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 6 <br /> agency,or 10 projects,if not specified. Complete one Section F for each project) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Mauna Kea Shoreline Restoration Project PROFESSIONAL SERVICES CONSTRUCTION <br /> Kohala Coast,Hawaii 2018 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> Hookuleana LLC— <br /> Prince Resorts Hawaii Peter Young 808-226-3567 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> The Mauna Kea Resort on Hawaii Island is <br /> planning improvements to their shoreline and <br /> hotel. Sea Engineering has been contracted to <br /> conduct detailed oceanographic and shoreline <br /> investigations to support implementation of <br /> these improvements. Work tasks included: <br /> h <br /> , ,. F ii._ <br /> `, . <br /> -v <br /> 1. Wave analyses including deepwater wave <br /> Il <br /> 1} �� '° climate, extreme deepwater wave height, <br /> 5\ I -., numerical wave modeling of wave <br /> \‘‘ , \ \ ,', transformation to shallow water, wave runup, <br /> analysis of a particular extreme wave event <br /> that resulted in backshore flooding, and sea <br /> i level rise impacts. <br /> 'ter i 11 2. Site investigations including beach profile <br /> measurements, beach topographic survey, <br /> ":// / . .,,,, i , . ,,, <br /> sand sampling and analysis, and assessment <br /> of coastal processes., ,,, . <br /> 3. Development of a dune restoration plan <br /> '` based on regional,typical dune morphologies. <br /> `" Sea level impacts were considered, and a <br /> design report prepared. <br /> JN Graph c Scala <br /> ._..al 75 o �s' ,50. <br /> :v ,.. •:,am," "`w".j!`c . ":k""' , .m"r'' � 4}:°«rae ww�z-«.., k <br /> Cost: $81,855 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> ç <br /> (City and State) <br /> Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.