F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
<br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10
<br /> 11
<br /> projects,if not specified Complete one Section F for each project)
<br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
<br /> PROFESSIONAL CONSTRUCTION
<br /> Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES
<br /> Hilo,Hawaii 2015 n/a
<br /> 23. PROJECT OWNER'S INFORMATION
<br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
<br /> USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370
<br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
<br /> Scope: Tropical Storm Iselle hit the east side of Noterie=,tee,tFesterm=mezaraoueconaiiions^ano«=.gr=aeovne=^ow
<br /> Hawaii Island at approximately 11:00 pm on August
<br /> 7, 2014,with near hurricane force winds of 70 mph.
<br /> Concerns that the Hilo Harbor channel would be °n
<br /> compromised by sunken debris or other obstructions
<br /> J Herme:<m�IP Tue aga;; PM Mo
<br /> °
<br /> / _ n Feer,
<br /> due to the effects of the storm prompted harbor °/A — d_
<br /> \nee 8 PM Fri
<br /> Fren
<br /> closure until a hydrographic survey could beii.:"
<br /> completed to verify that the channel was clear of °" 8 P 5Foa6 ---
<br /> 8 PM Sat
<br /> obstacles. Sea Engineering,Inc. (SE)was notified at 11 PM Thu
<br /> approximately noon on August 7,2014,that a survey -?>>` 111L—.4,s,,
<br /> would be necessary the following day at Hilo Harbor. �.a, ,ssaA
<br /> Tropical Storm Iselle 'Current Information: • Forecast Positions:
<br /> Two survey engineers from Sea Engineering with _:• ce°=er s.,w •rroa calcv oP°39Troo cal
<br /> Max Sustained Wind man sustai°em winds: D mph
<br /> equipment flew to Hilo mid-morning on August 8 to Potential TackArea:an cenrer Watches: ewee, p Wa'^^95„,4„° as n >„°aoa
<br /> conduct the survey. The survey was successfully �Day
<br /> 1-3L= Hay 9-5
<br /> completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor
<br /> was immediately re-opened.
<br /> ,_” 13 Co
<br /> `` 37
<br /> �
<br /> 40 M l 38 14 f ) 13
<br /> � -
<br /> (
<br /> LZ 73 35 . 14 13
<br /> 9 a 11,
<br /> 3936 39 3a35 1s rnaer, 19 • 14LATFORM 3
<br /> 11 13 - _
<br /> pyryli Em.rr, t„7
<br /> 23
<br /> 4.---ctor'a t:', 4°-- '"----z` A41,,,,,,,,',,-:*':?4,i2 7 7,ir,' .1„, , 36
<br /> �
<br /> 11' - 'ems `T
<br /> I "42
<br /> �7,,,- ' 28 1` 'r=v.. � . ,v,:
<br /> - - -- - _ e ua� 31
<br /> „r„/•. Ca f;. t----- I_
<br /> 5 10 +d
<br /> 5 IV rR 60 ANCHORAGE ARE h �46
<br /> 9.-.•f°° 9 g 1i0.?28b(seenoteA) 8 g, k
<br /> Rk
<br /> Fnul• 7 h l0 4i
<br /> Scan sonar mosaic of Federal Project Area,Hilo Harbor
<br /> Cost: $15,000
<br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
<br /> -�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
<br />
|