Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 <br /> 11 <br /> projects,if not specified Complete one Section F for each project) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES <br /> Hilo,Hawaii 2015 n/a <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Scope: Tropical Storm Iselle hit the east side of Noterie=,tee,tFesterm=mezaraoueconaiiions^ano«=.gr=aeovne=^ow <br /> Hawaii Island at approximately 11:00 pm on August <br /> 7, 2014,with near hurricane force winds of 70 mph. <br /> Concerns that the Hilo Harbor channel would be °n <br /> compromised by sunken debris or other obstructions <br /> J Herme:<m�IP Tue aga;; PM Mo <br /> ° <br /> / _ n Feer, <br /> due to the effects of the storm prompted harbor °/A — d_ <br /> \nee 8 PM Fri <br /> Fren <br /> closure until a hydrographic survey could beii.:" <br /> completed to verify that the channel was clear of °" 8 P 5Foa6 --- <br /> 8 PM Sat <br /> obstacles. Sea Engineering,Inc. (SE)was notified at 11 PM Thu <br /> approximately noon on August 7,2014,that a survey -?>>` 111L—.4,s,, <br /> would be necessary the following day at Hilo Harbor. �.a, ,ssaA <br /> Tropical Storm Iselle 'Current Information: • Forecast Positions: <br /> Two survey engineers from Sea Engineering with _:• ce°=er s.,w •rroa calcv oP°39Troo cal <br /> Max Sustained Wind man sustai°em winds: D mph <br /> equipment flew to Hilo mid-morning on August 8 to Potential TackArea:an cenrer Watches: ewee, p Wa'^^95„,4„° as n >„°aoa <br /> conduct the survey. The survey was successfully �Day <br /> 1-3L= Hay 9-5 <br /> completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor <br /> was immediately re-opened. <br /> ,_” 13 Co <br /> `` 37 <br /> � <br /> 40 M l 38 14 f ) 13 <br /> � - <br /> ( <br /> LZ 73 35 . 14 13 <br /> 9 a 11, <br /> 3936 39 3a35 1s rnaer, 19 • 14LATFORM 3 <br /> 11 13 - _ <br /> pyryli Em.rr, t„7 <br /> 23 <br /> 4.---ctor'a t:', 4°-- '"----z` A41,,,,,,,,',,-:*':?4,i2 7 7,ir,' .1„, , 36 <br /> � <br /> 11' - 'ems `T <br /> I "42 <br /> �7,,,- ' 28 1` 'r=v.. � . ,v,: <br /> - - -- - _ e ua� 31 <br /> „r„/•. Ca f;. t----- I_ <br /> 5 10 +d <br /> 5 IV rR 60 ANCHORAGE ARE h �46 <br /> 9.-.•f°° 9 g 1i0.?28b(seenoteA) 8 g, k <br /> Rk <br /> Fnul• 7 h l0 4i <br /> Scan sonar mosaic of Federal Project Area,Hilo Harbor <br /> Cost: $15,000 <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> -�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering <br />