Laserfiche WebLink
HALA`ULA <br /> PRODUCTION WELL Project Summary: <br /> The Department of Water Supply proposed to convert an <br /> Planning Solutions, Inc. existing exploratory well to a production well as a source <br /> for its Hawi-Hala`ula Water System. The project <br /> Client: Tom Nance Water included a 0.50 million-gallon storage tank,well, access <br /> road improvements, and modifications to the underground <br /> Resource Engineering distribution pipelines. PSI had obtained the approvals for <br /> the exploratory well and employed that knowledge to <br /> efficiently complete this task. <br /> PSI Role: Subconsultant ,/;,' _-- <br /> Documents Prepared: <br /> • Draft EA (HEPA) j},'' ,A a � <br /> • Final EA (HEPA) / �� <br /> fi <br /> • CIA �� / / v : �4k � , . - <br /> Arse <br /> Approvals Obtained: <br /> • FONSI ro $ <br /> .o d <br /> • NPDES Construction NGPC _ m ,• �a <br /> R <br /> Commence: 2016 ; , ,y �°o : <br /> 1,/as <br /> oii..;.11110.0 <br /> Complete: 2019 j ok <br /> Hala`ula production well and tank layout plan. <br /> Team Members: <br /> • Rana Biological Consulting Detail: <br /> Budget: S48,000 PSI: <br /> • Completed the HRS Chapter 343 HEPA EA process <br /> in less than a year. <br /> • Conducted the CIA in house. <br /> • Worked with the project engineer and consulted <br /> with the Army Corps of Engineers so that the <br /> pipeline modifications did not trigger additional <br /> permitting. <br /> • Coordinated with SHPD and obtained their approval <br /> without the need for new archaeological surveys. <br /> • Obtained NPDES coverage in less than 2 months <br /> from notice to proceed with that task. <br /> 711 Kapi olani Boulevard,Suite 950 r n <br /> Honolulu, Hawaii 96813-5213 <br /> Phone:808-550-4483•www.psi-hi.com <br />