My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-25 PL-INT-2024-008061 Planning Solutions, Inc. Category PL.4
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.04 - Community, Regional Plans, General Plan, Climate Adaption
>
2024-06-25 PL-INT-2024-008061 Planning Solutions, Inc. Category PL.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 10:59:03 AM
Creation date
7/10/2024 2:48:23 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/25/2024
Permit Number
PL-INT-2024-008061
Description
Planning Solutions, Inc. Professional services for category PL.3, PL.4, PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUKE <br /> KAHANAMOKU Project Summary: <br /> LAGOON PSI and engineer team member developed a plan to <br /> greatly increase lagoon water turnover using saline <br /> groundwater instead of ocean water, reduce the lagoon's <br /> RESTORATION <br /> volume, seal the accumulated sediment beneath a liner, <br /> reroute storm water runoff away from the lagoon, and <br /> Planning Solutions, Inc. replenish the sand that had eroded from the beach. The <br /> restoration has been widely hailed as exceptionally <br /> Client: Hilton successful, turning what had become an unused backwater <br /> into a center of recreational activity. <br /> PSI Role: Prime <br /> Documents Prepared: <br /> • Draft EA (HEPA) " / <br /> • Final EA (HEPA) <br /> l <br /> • Permit applications o, a. <br /> �.• li by �� <br /> ' 'tel r 9.. <br /> Approvals Obtained: 1,:s41V4 I <br /> • FONSI ' <br /> • CDUP <br /> ,. . <br /> • Section 404 Individual Permit ' a,, . 1 .o�•w <br /> • Section 401 WQC \\ . <br /> gmm <br /> • CZM <br /> Lagoon restoration layout plan(red dashed line illustrates previous extent of lagoon). <br /> • SMP Major <br /> • NPDES Construction NGPC Detail: <br /> • NPDES Operations <br /> Once Hilton agreed to the restoration concept, PSI's team <br /> • Special District obtained all the necessary approvals and permits in 2 <br /> • Planned Development Resort years within the budget. Construction was complete two <br /> • Well permits years later in 2007. <br /> As with all complex projects, PSI maintained a detailed <br /> Commence: 2003 schedule to ensure tasks were conducted in parallel to the <br /> maximum extent possible, which shortened the overall <br /> Complete: 2005 permitting schedule. <br /> Budget: 5600000 Hilton was pleased with PSI's performance and has <br /> retained PSI to conduct permit-required annual water <br /> quality monitoring since the lagoon reopened. <br /> 711 Kapi olani Boulevard,Suite 950 rn <br /> Honolulu, Hawaii 96813-5213 <br /> Phone:808-550-4483•www.psi-hi.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.