Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Randall M. Urasaki, PE, LEED AP BD+C Principal in Charge (PIC)or Technical a.TOTAL b.WITH CURRENT <br /> Resource/Quality Assurance FIRM <br /> 37 37 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> WSP USA Inc., Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.B.A. Hawaii, Professional Engineer; <br /> B.S., Civil Engineering Hawaii, LEED AP BD+C <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Society of Civil Engineers <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pali Highway Emergency Repairs and Landslide Mitigation Project, Oahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawaii 2019 2020 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Project manager for the planning, permitting and design of emergency repairs and permanent repairs to remediate damage caused by <br /> landslides above the Old Nuuanu Pali Road and Pali Highway. Permanent repairs include design of an 80-foot long rock shed above <br /> the Honolulu-bound lanes to provide additional protection and resiliency to the Highway. The project is funded with State and Federal <br /> funding. The firm's scope of work includes obtaining the National Environmental Policy Act(NEPA) Categorical Exclusion, Section 7 <br /> ESA coordination, and Section 106 NHPA coordination with a Section 106 MOA. Design work includes slope stabilization, drainage, <br /> and communication and electrical ducts. Contract Fee: $1.3 million. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kauai Emergency Flood Repairs and Cleanup at Various Locations April 2018, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Northern and Eastern Kauai, Island of Kauai, Hawaii 2018 On-going <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager for environmental permitting and civil design for the emergency repairs to restore the closed portions of Kuhio <br /> Highway from Hanalei to Kee. Project scope included plans,specifications, and cost estimate (PS&E), and coordination of NEPA, <br /> Section 106, Section 7 environmental clearances, and 404 Permits for over 26 individual repair sites. Contract Fee: $1.1 million. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> County of Hawaii's Hakalau Stream Bridge(Bridge No. 29-3)Emergency PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Repairs, Hilo, Island of Hawaii, Hawaii 2017 2018 <br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager for environmental permitting and civil design associated with scour repair at the County of Hawaii's Hakalau Stream <br /> Bridge. WSP coordinated and prepared documentation for environmental clearances in NHPA Section 106, ESA Section 7, <br /> Magnuson-Stevens Fisheries Act, Fish and Wildlife Coordination Act, Section 4(f), CWA Section 404, CWA Section 401, CZM, and <br /> NEPA Categorical Exclusions. Contract Fee: $247 thousand. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Natural Energy Laboratory of Hawaii Authority(NELHA)Airport Connector PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Road Project, Kailua-Kona, Hawaii 2019 2019 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> d. Project manager for the planning, permitting and design of approximately 3 miles (4.8 kilometers)of new roadways within the NELHA <br /> property. The project is funded with State and Federal funding. The firm's scope of work includes obtaining the National <br /> Environmental Policy Act(NEPA) Categorical Exclusion and Coastal Zone Management Certification. Design work includes roadway <br /> alignment, roadway construction, drainage, pavement markings and signing, potable water,salt water, permanent best management <br /> practices (BMPs), and communication and electrical ducts. <br /> Contract Fee: $974 thousand. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Earthquake Disaster Response and Project Delivery Program, Island of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawaii, Hawaii 2010 2011 <br /> e. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager for this emergency project to provide assistance to the HDOT-Hawaii staff after a powerful earthquake and <br /> aftershocks caused damages to the HDOT's roadway system island-wide. We provided on-site assistance in management and <br /> coordination. We also coordinated and applied for necessary permitting for the various projects. <br /> Contract Value: $770 thousand <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 2 <br />