My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-23 PL-INT-2024-008060 WSP USA Inc. Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-23 PL-INT-2024-008060 WSP USA Inc. Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 10:56:13 AM
Creation date
6/25/2024 2:16:28 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/23/2024
Permit Number
PL-INT-2024-008060
Description
WSP USA Inc. Professional services for category PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Todd S. Nishioka, PE Environmental Task Leader or a.TOTAL b.WITH CURRENT <br /> Technical Resource/Quality Assurance FIRM <br /> (Environmental) 26 8 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> WSP USA Inc., Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering Hawaii, Professional Engineer <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Permitting Assistance, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> On-going <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> Deputy project manager for the City and County of Honolulu Department of Design and Construction Environmental Permitting Project. <br /> a. His duties include developing the City and County of Honolulu, Department of Design and Construction's (DDC)Specification Policy <br /> and Procedures, developing DDC environmental program including but not limited to environmental templates,training DDC staff on <br /> environmental regulations, training DDC staff on how to identify and navigate environmental requirements for their projects, assisting <br /> DDC staff on developing schedules etc. His other duties will include developing a staff study to determine the new environmental <br /> structure within DDC. <br /> Contract Value: $4 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HDOT's Environmental Permitting and Compliance Section PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawaii 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I I Check if project performed with current firm <br /> Assisted in the development of HDOT's Environmental Permitting and Compliance Section. This effort consisted of developing the <br /> b. Section's functional description, position descriptions and hiring of the employees within this Section. He played a lead role in the <br /> development of the policy and procedures of HDOT's environmental program. He had oversight over the development of Section 106 <br /> of the National Historic Preservation Act, Section 7 of the Endangered Species Act, the National Environmental Policy Act, Hawaii <br /> Revised Statutes 343 Environmental Impact Statement guidelines. His Section served to provide environmental guidance and <br /> direction to the Highways Division and the County Federal Aid Program. His section also served as the primary environmental clearing <br /> house for emergency related projects. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HDOT's Storm Water Management Program Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2016 <br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I I Check if project performed with current firm <br /> Assisted in the development of the Storm Water Management Program Plan. From 2005 until 2016, he served to develop and manage <br /> the Permanent Best Management Practices (PBMPs) program. He worked with consultants in providing guidance and direction on <br /> which PBMPs were most appropriate for the project and the life cycle analysis for the program. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HDOT's Modified Water Quality Certification Process PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I I Check if project performed with current firm <br /> d. Was the lead role in the development of the modified Water Quality Certification Process. He worked with the Federal Highways <br /> Administration, Central Federal Lands to develop An Integrated Storm Water Management Approach and a Summary of Clear Water <br /> Diversion and Isolation Best Management Practices for Use in the State of Hawaii, by the Federal Highway Administration and Hawaii <br /> Department of Transportation, Practitioners Guide. This new process serves as the example for interagency coordination and an <br /> expedited process to Storm Water Management. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.