E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Doug Williams, P.E. Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 12 2
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS,2014,University of New Mexico,Civil Engineering • Hawai`i,Registered Professional Engineer(PE 20343)
<br /> • New Mexico,Registered Professional Engineer(Lic.No.24877)
<br /> • Oregon,Registered Professional Engineer(Lic.No.94490PE)
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA 40-Hr HAZWOPER,OSHA 30-Hr Construction • Authored:"Santa Fe River Trout Habitat Restoration(2017),Landfill Gas
<br /> • SWANA Member,AWWA Member Collection and Control System Design in an Arid and Remote Site(2022),
<br /> Sheet Flow to Shallow Concentrated Flow(2023)"
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Protection Agency Compliance,Storm Water Management Program PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> for the Island of 0`ahu,State of Hawaii Department of Transportation(0`ahu,Hawai`i) 2028
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a.
<br /> Engineering design and regulatory compliance services for the State of Hawaii Department of Transportation to address storm water management
<br /> requirements mandated by the NPDES MS4 Permit.Program manager and civil/environmental engineer for the erosion control,erosional outfall,and
<br /> permanent best management practices programs.Serves as design manager and subject matter expert for erosion control and permanent best management
<br /> practices for stormwater quality.Annual contract value of$6 million.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lahaina Stormwater Capture,Conveyance,and Treatment Design, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> State of Hawai'i Department of Transportation(Maui,Hawai`i) 2024
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b.
<br /> Engineering design services for the State of Hawaii Department of Transportation to mitigate impacts to receiving waters and ecosystems from
<br /> contaminated stormwater runoff from burn areas of the Lahaina wildfire that occurred in August 2023.Design included capturing runoff from existing
<br /> storm drainage infrastructure,and conveying water to a treatment system prior to discharge to the ocean.Treatment system included coagulation,
<br /> flocculation,clarification,and multi-media filtration.Served as technical lead and design manager.
<br /> '1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waiahi Drinking Water Plant Turbidity Assessment, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Grove Farm(Kaua`i,Hawai`i) 2024
<br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Provided engineering design services to assess process treatment reject turbidity levels as part of an effort to comply with the NPDES discharge permit.
<br /> Scope of work included evaluating current operations,equipment,and treatment processes and to estimate loading and to provide recommendations for
<br /> potential alternatives to ensure effluent limits are not exceeded.Served as technical lead.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Eagle Rock and Montessa Park Convenience Centers Improvements,Design and Services PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> During Construction;Solid Waste Management Department(Albuquerque,New Mexico) 2023 2024
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> d.
<br /> Provided engineering design services for improvements and repairs to existing municipal solid waste transfer stations necessary to facilitate effective and
<br /> efficient unloading,consolidation,and load out of waste and recyclable commodities.Services during construction were also included in the scope of work
<br /> which includes but is not limited to contractor submittal review and responses,responses to requests for information,schedule management,and technical
<br /> construction oversight.Served as project manager,facility design lead,design manager,and engineer of record.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Miscellaneous Storm Drain Improvements Projects, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> State of Hawai`i Department of Transportation(Maui,Hawai`i) On-going
<br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Z Check it project performed with current firm
<br /> Provides engineering design services for improvements to existing drainage structures of the HDOT Maui District M54.Improvements included repair
<br /> and raising existing grated inlets,raising existing manholes,pavement restoration,and repairing existing pipe connections.Served as design lead,design
<br /> manager,and engineer of record.Annual contract value of$5 million.