Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> John Hart <br /> Project Manager/ a.TOTAL b.WITH CURRENT FIRM <br /> Senior Environmental Scientist 34 4 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS,1989,Texas Christian University,Marine Biology <br /> AA,1981,Orange Coast College,Construction Management <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • TxDOT Construction Inspection Certification • Permit-Required Confined Space Certified Instructor <br /> • TCEQ Certified Water Quality Monitoring Instructor • American Red Cross First Aid and CPR Certified Instructor <br /> • 24 Hour HazMat Specialist(29 CFR 1910.120)Certified Instructor • U.S.Army 40-hour EM-385 Construction Safety Training <br /> • Permit Required Confined Space Rescue,OSHA Certificate • OSHA 30-hour Construction Safety Training <br /> 19.RELEVANT PROJECTS <br /> '1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Management and Monitoring Services for the Villages of Kapolei, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Hawai`i Housing Finance and Development Corporation(Kapolei,Hawai`i) 2027 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. <br /> Project Manager for Contract No.DEV 23-10,to prepare NOI submissions for NPDES permits authorizing discharges of stormwater associated with <br /> construction activities,and updating the existing SWPPP,and completing a Drainage Injection Well Permit Renewal Application for the DOH Safe Drinking <br /> Water Branch.In addition,he manages field inspectors conducting permit required inspections and monitoring,and properly operating and maintaining the <br /> UIC injection wells.Project cost:$447,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> M54 Permit Acquisition and SWMP Development Services for the Hawai`i Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Land and Natural Resources,Division of Boating and Ocean Recreation(0`ahu,Hawai`i) On-going <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for all Division of Boating and Ocean Recreation(DOBOR)harbors stormwater management,Mr.Hart is responsible for the development <br /> and implementation of DOH-CWB requirements for submission and approval of an MS4 multi-facility island wide stormwater program MS4 permit <br /> coordination and negotiation with the DOH-CWB.Responsibilities include developing and submitting a island wide SWMP,control/enforcement <br /> mechanisms,and designation and mapping of facilities within the regulated area for approval by DOH-CWB.Project cost is$153,430. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Statewide M54 NPDES Permit Program Management, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Oklahoma Department of Transportation(Statewide,Oklahoma) On-going <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. <br /> As Project Manager for ODOT Statewide stormwater management,Mr.Hart is responsible for the development and implementation of DEQ requirements <br /> for submission and approval of a combined Phase I&II Nt-MS4 statewide stormwater program including refinement and implementation of existing Phase <br /> I&H Municipal Separate Storm Sewer System(MS4)permits.Responsibilities include developing and submitting a Statewide Stormwater Management <br /> Program(SWMP),control/enforcement mechanisms,and designation and mapping of facilities within the regulated area for approval by DEQ. <br /> Project cost is$150,000 per Task Order,currently on second task order. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Statewide Environmental Engineering Management and Inspection Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> State of Hawaii Department of Transportation-Airports Division(Statewide,Hawai`i) 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> d. <br /> Project Scientist for Contract No.67649,to provide technical support to DOTA to meet its NPDES MS4 Permit compliance requirements.These <br /> requirements include developing and implementing HNL Individual Permit and OGG General Permit minimum control measure requirements that address <br /> all aspects of public education and outreach,illicit discharge detection and elimination,construction site runoff control,post construction best management <br /> practices,pollution prevention and good housekeeping,and tenant activities discharge management.Responsibilities also include to ensure that reports and <br /> other required submittals are prepared and submitted to the regulatory authorities in a timely manner.Project cost:$9,000,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Statewide M54 NPDES Permit Program Management, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Texas Department of Transportation,(Statewide,Texas) 2019 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm <br /> e. <br /> As Project Manager for TxDOT Statewide stormwater management,Mr.Hart received EPA and State approval to combine TxDOT's 15 Individual and 19 <br /> General NPDES MS4 permits into a single Statewide permit to streamline and reduce costs of existing stormwater program implementation through ease of <br /> implementation and reporting,and in compliance with Section 402 of the CWA.The final combined permit was issued on November 30,2016,and included <br /> the EPA negotiated removal of wet-weather monitoring and Trash Reduction Plan monitoring from TxDOT's permit requirements avoiding anti-backsliding <br /> perception and has saved TxDOT over$2,500,000.00 annually in monitoring and reporting costs.Project cost was$2,000,000. <br />