Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 5 <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Voluntary Response Program-Environmental Site Investigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> of Former Waialua Sugar Mill(Waialua,Hawaii) 2019 <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Castle&Cooke Waialua,LLC Chris Loworn (808)548-3714 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Based on historical operations at the Waialua Sugar Mill facility,the suspect contaminant sources <br /> generally included former underground and aboveground fuel storage tank systems,pesticide • <br /> mixing and loading activities,vehicle maintenance activities,electrical transformer storage,former I-mil mil <br /> sugarcane processing operations,and a commercial vehicle towing baseyard. ! <br /> Under the VRP,ETC investigated the extent of soil and groundwater contamination for metals <br /> (arsenic,cadmium,lead,mercury,thallium,vanadium,zinc);herbicides/pesticides;dioxins/ <br /> furans;polychlorinated biphenyls(PCBs);total petroleum hydrocarbons as diesel/gas/oil(TPH-D, <br /> TPH-G,TPH-0);methyl tertiary-butyl ether/benzene/toluene/ethylbenzene/xylenes(MBTEX); <br /> dimethyl phthalate;polynuclear aromatic hydrocarbons(PAH5);and halogenated volatile organic Q., , <br /> 111. r <br /> compounds(HV005).In order to assess the potential impacts,the site was divided into 27 surface <br /> and/or subsurface decision units.Discrete and multi-increment soil samples were collected w from these 27 decision units.Monitoring wells were also installed and sampled using low-flow ' <br /> methodology to assess potential impacts to the underlying groundwater.Approximately 80 >° <br /> discrete soil samples,multi-increment soil samples,and groundwater samples were collected <br /> and analyzed.In addition,ETC also conducted personal,perimeter,and work area air monitoring, �., �;E,:_ <br /> during all aspects of the project to protect the workers and surrounding public. <br /> Deliverables for the project included a Phase I ESA,conceptual site model,and general and ,. <br /> detailed site investigation plan.Specifically,a Site Investigation Report and Environmental Hazard <br /> Evaluation(SI-EHE)was prepared to document site investigation activities,compare data to <br /> applicable DOH EALs,and evaluate/discuss all potential environmental hazards associated with <br /> the site.A Remedial Alternatives Analysis(RAA)evaluated four potential remedial alternatives, <br /> which were then compared to nine evaluation criteria.Upon completion of the RAA,a Draft <br /> Remedial Action Memorandum(Draft RAM)was created to summarize findings and activities <br /> performed to date.A Public Participation Plan was also developed to solicit input from members <br /> of the affected public regarding the planned work to be completed on portions of the site to <br /> mitigate environmental hazards.A Public Meeting was then held and comments obtained <br /> through the public participation program were used to create a Final RAM and develop a <br /> Remedial Action Work Plan. Relevant Services <br /> Prior to implementation of the selected remedial action,an interim Environmental Hazard <br /> Management Plan(EHMP)was prepared for use by the site contractor.Construction activities for Environmental Site <br /> the implementation of the selected remedial action were monitored to ensure adequate controls Assessment(ESA) <br /> were maintained to minimize or eliminate airborne contaminant hazards.Following completion of <br /> construction,a Remedial Action Report was completed to document the implementation of the a <br /> final remedy and a final EHMP for managing the remaining environmental hazards on-site was �jQQI Environmental Hazard <br /> prepared.In December 2018,the DOH issued a Letter of Completion,subject to the terms and — , Evaluation <br /> conditions of an Environmental Covenant Agreement,the final EHMP,and the completion of a <br /> Groundwater Monitoring Program. ^©— Remedial Action <br /> "• &Design <br /> Contract Amount:$750,000 <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant <br /> STANDARD FORM 330(REV.7/2021) <br />