My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-26 PL-INT-2024-008062 EnviroServices and Training Center, LLC Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-26 PL-INT-2024-008062 EnviroServices and Training Center, LLC Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 11:02:55 AM
Creation date
6/27/2024 7:18:37 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/26/2024
Permit Number
PL-INT-2024-008062
Description
EnviroServices & Training Center, LLC, Professional services for category PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CO <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each proj <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Environmental Engineering Services for East Kapolei II Pesticide Mixing and Loading Site PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Kapolei,Hawaii) 2015 <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> State of Hawaii,Department of Hawaiian Home Lands Darrell Ing (808)620-9276 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) <br /> EnviroServices&Training Center provided environmental engineering services in <br /> support of final site remediation.The project was primarily funded through a loan from r, ! <br /> the Hawaii Brownfields Revolving Loan Fund and a USEPA Brownfields Cleanup Grant. - <br /> iII <br /> General tasks completed for this project included: <br /> • Prepared a Community Involvement Plan <br /> • Initiated dialog with members of the affected community to obtain input on the <br /> remedial alternatives <br /> • Identified potential hazardous materials existing on and within existing structures °''� <br /> •ROJECT <br /> • Identified and abated hazardous building materials(asbestos and lead paint) a SITE , <br /> • Decontaminated,decommissioned,and disposed of existing aboveground storage and <br /> mixing tanks(9 total) <br /> • Demolished existing site structures -,\ <br /> • Conducted additional characterization of site soils(Site Investigation Work Plan)to <br /> refine estimates of the magnitude and extent of contaminant impacts to site soils <br /> • Identified environmental hazards posed by the existing site contamination <br /> (Site Investigation Report—Environmental Hazard Evaluation) <br /> • Identified and evaluated appropriate remedial alternatives to address contaminated <br /> media(Remedial Alternatives Analysis) (' <br /> • Solicited input from interested members of the public regarding preferred remedial • A ' A <br /> alternatives through a Public Notice and an informational open house > ,,;' ; <br /> • Provided planning and design for the selected remedial response action(Response <br /> `14 <br /> Action Memorandum,Remedial Action Work Plan) <br /> • Prepared construction specifications and drawings for use in bid documents <br /> • Evaluated qualifications of contractors that submitted bids for the remediation project <br /> • Prepared a NPDES Permit application,including a Stormwater Pollution Control Plan <br /> and Erosion Control Plan <br /> • Provided construction management services during implementation of the selected <br /> remedial action Relevant Services <br /> • Conducted confirmation sampling following excavation of contaminated soils <br /> • Prepared a Remediation Verification Report to summarize and document the Environmental Site <br /> response action. Assessment(ESA) <br /> • Prepared an Environmental Hazard Management Plan to document remaining <br /> hazards at the site. <br /> Remedial Action <br /> and Design <br /> Contract Amount: $720,000 <br /> �QNPDES Permitting, <br /> J SPCC Planning,& <br /> c� Erosion Control Planning <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center,LLC Honolulu,Hawaii Prime Consultant <br /> STANDARD FORM 330(REV.712021) <br />
The URL can be used to link to this page
Your browser does not support the video tag.