My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008096 Bowers + Kubota Consulting Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-28 PL-INT-2024-008096 Bowers + Kubota Consulting Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:36:31 PM
Creation date
7/10/2024 3:05:32 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008096
Description
Bowers + Kubota Consulting, Professional services for category PL.3, PL.4, PL.5. PL.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified. 2 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION(fapplcab/e) <br /> Kahawainui Stream Dredging Ongoing N/A <br /> Laie,HI <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> City and County of Honolulu,Department Kristie Ching (808)768-8800 <br /> of Design and Construction <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> SCOPE: Bowers +Kubota Consulting is preparing construction plans and specifications for the maintenance dredging of the City- <br /> owned portion of Kahawainui Stream between the intersection with Laie Wai Stream to the mouth of the stream excluding the sand <br /> berm at the stream mouth. An environmental review consisting of a Draft and Final Environmental Assessment,with an anticipated <br /> Finding of No Significant Impact(FONSI), will be prepared in accordance to the Hawaii Revised Statutes Chapter 343. The review <br /> will include a biological survey,archaeological and cultural study,and other environmental reports to determine impacts of the project <br /> and mitigation measures.Preparation of permit applications for the dredging and obtaining permit approvals is included in the project <br /> scope along with engineering assistance during the bidding and construction. <br /> PROJECT COST: $2,000,000 <br /> mum- <br /> �4 .,Y ss ttz ii, �u L <br /> • <br /> a <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. (Bowers+Kubota Consulting,Inc. Waipahu,HI Planner,Civil Engineer <br /> STANDARD FORM 330(7/2021)Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.