My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:38:02 PM
Creation date
7/1/2024 9:16:14 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008098
Description
Brown and Caldwell, Professional services for category PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pure Water San Diego Program,San Diego,California PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing Forthcoming <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Technical Advisor.This program is intended to reduce dependence on imported water, resulting in the production of <br /> 83-million-gallons-per-day of advanced purified water. Facilities are being built at three locations,the first of which is <br /> at North City Advanced Water Purification Facility.The 34-million-gallons-per-day plant will augment the potable water <br /> supply at the San Vicente Reservoir.Wendy performed a senior technical design review of the engineering report for <br /> 10-percent design of the North City Advanced Water Purification Facility and continues to advise on advanced water <br /> purification processes and recycled water upgrades as needed. <br /> Total Contract Amount: $3B Client:City of San Diego Public Utilities Dept. (PUD), Pure Water San Diego Program <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> One Water Honolulu Plan, Honolulu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Technical Advisor.The city's initiative, "One Water Honolulu," aims to create resource and financial efficiencies in <br /> the face of changing natural and urban water cycles. It manages stormwater,wastewater,groundwater,seawater, <br /> freshwater,graywater,and recycled water as one integrated resource. Infrastructure such as roadways, buildings, <br /> parks,trees,treatment plants, pumping stations,water distribution systems,drainage, and wastewater collection <br /> systems are considered part of a One Water management system.The One Water Plan is a key next step, building <br /> upon current goals, policies,and programs.The proposed One Water Plan will serve as a collaborative adaptation <br /> framework, prioritizing integrated projects and policies to support and advance the Oahu Resilience Strategy.Reuse <br /> Operator Training and Certification in California with collaborative partners and key stakeholders in the industry. <br /> Total Contract Amount: $4M Client:City and County of Honolulu, Dept. of Environmental Services <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.