Laserfiche WebLink
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> County of Hawaii, Planning Department <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Lynn Stephens, PE*, ENV SP i ial a.TOTAL b.WITH CURRENT FIRM <br /> Change/One Water) 16 15 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell,Seattle,Washington <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MSE, Environmental Engineering, 2009 *Washington/Licensed Civil Engineer#50145 <br /> BS,Civil Engineering, 2007 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Envision Sustainability Professional (ENV SP) <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Impacts of Climate Change on Honolulu Water Supplies and Planning PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Strategies for Mitigation, Honolulu, Hawaii 2019 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager.The Water Research Foundation and Honolulu Board of Water Supply selected BC to develop <br /> a climate change adaptive management plan to mitigate potential risks to the Honolulu Board of Water Supply's <br /> water supply and treatment and distribution system infrastructure.The primary objective was to evaluate climate <br /> change impacts on the Honolulu Board of Water Supply and its assets.The project incorporated scenario planning <br /> and uncertainty into the process to assess the reliability and resiliency of critical infrastructure.A suite of adaptive <br /> measures was identified for the planning horizon for the study: 2020-2100.The project included collaboration with <br /> other local government agencies given the level of investment and the widespread impact to infrastructure from sea <br /> level rise. <br /> Total Contract Amount: $275K Client: Honolulu Board of Water Supply/Water Research Foundation <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> WRF Project 4660: Blueprint for One Water, Nationwide PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> 2017 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC managed the development of a Blueprint for One Water, a framework that other utilities,entities, <br /> and policy decision makers could leverage internationally to embark on a One Water or integrated water resources <br /> approach.As a part of the project,a national survey was conducted and received over 800 responses, more than <br /> 10 one-on-one utility interviews were completed,and BC's project manager co-facilitated a two-day international <br /> workshop with more than 35 utilities and water professionals in New York City.The blueprint includes step-by-step <br /> guidance including critical phase and steps, important actions, possible challenges,and key outcomes for each step <br /> in a One Water approach. <br /> Total Contract Amount: $85K Client:Water Research Foundation <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Upper Kimo Tank Chloramine Retrofit, Kula, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> 2020 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Engineer. BC was retained to prepare a preliminary design of a new system to convert free chlorine to <br /> chloramines when water is pumped from the Lower Kula water system to the Upper Kula water system in Upcountry, <br /> Maui.The project included chlorine, ammonia,and pH adjustment chemical addition systems. <br /> Total Contract Amount: $189K Client:County of Maui, Dept. of Water Supply, Engineering Division <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 17 <br />