My WebLink
|
Help
|
About
|
Sign Out
Home
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 24-25
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2024-06-28 PL-INT-2024-008098 Brown and Caldwell Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:38:02 PM
Creation date
7/1/2024 9:16:14 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
6/28/2024
Permit Number
PL-INT-2024-008098
Description
Brown and Caldwell, Professional services for category PL.5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Department Section E <br /> PL.5)Community Planning(Environmental Planning,Environmental Assessments,Environmental Impact Statements) Fiscal Year 2024-2025 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Resiliency Master Plan, Portland, Oregon PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Technical Advisor.This Resiliency Master Plan supports the City's vision of being a "resilient utility"over the next <br /> 50 years. Since becoming the first U.S. City to adopt a Climate Action Plan more than 20 years ago,the City has <br /> continued to be a leader in advancing environmental and social initiatives.The Resiliency Master Plan will serve <br /> as a road map to reduce the City of Portland's Bureau of Environmental Services systems'vulnerability to natural <br /> disasters and develop a path to increase preparedness.The outcome from this project will be an Integrated Plan that <br /> incorporates the risk assessments and uncertainty in addition to providing flexibility to continually re-evaluate risks <br /> overtime as new information becomes available.The Resiliency Master Plan will identify the benefits and costs of <br /> both near and long-term actions to ultimately incorporate resiliency planning into its capital programs. <br /> Total Contract Amount: $521K Client:City of Portland, Bureau of Environmental Services <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Program Management Services for the Expansion of the City of PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Lake Oswego's Water Supply System, Lake Oswego-Tigard Water 2017 2018 <br /> Partnership, Cities of Lake Oswego and Tigard,Oregon <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Engineer. BC managed a capital program to plan,design, permit,and construct a multi-project expansion of <br /> the existing water system.The program incorporated 6 projects totaling$220M worth of improvements, including <br /> the expansion of Lake Oswego's WTP from 16 million gallons per day to 38 million gallons per day. Involved reviewing <br /> and evaluating WTP process alternatives on a treatment performance and life-cycle cost basis.The treatment <br /> technologies considered included conventional treatment, membrane filtration, enhanced coagulation, ballasted <br /> flocculation, powdered activated carbon, biofiltration, ultraviolet disinfection, and ozonation. Based on this analysis, <br /> the Partnership pursued plant expansion and upgrades from a direct filtration system to conventional filtration with <br /> the addition of ozone disinfection prior to biofiltration to meet regulatory water quality goals, ensure a proactive means <br /> to mitigate taste and odor concerns,and remove unwanted organics from the source water. <br /> Total Contract Amount: $37M Client: Lake Oswego-Tigard Water Partnership <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.