Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jason Y. Lee, P.E. Senior Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 27 3 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS Civil Engineering/1996 Hawaii, Civil Engineering, No. 13669 <br /> Nevada, Civil Engineering, No.15275 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Computer Skills: AutoCAD, ArcGIS, HEC-1, HEC-2, HEC-RAS, Flo-2D,WSPGW, FlowMaster, CulvertMaster <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waikiki Aquarium Effluent Discharge System Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawaii 2023 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> a. Senior Civil Engineer. Evaluated and designed upgrades for the aquatic life exhibit effluent disposal system to <br /> meet the NPDES regulatory requirements. Served the role of Project Manager and Technical Lead of the Design <br /> Team for the preparation of construction plans, specifications, and cost estimates. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Saddle Road—West Side Mamalahoa Hwy(SR 190)to MP 41 (Daniel k. PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Inouye Hwy) 2010 <br /> Island of Hawai'i, Hawai'i <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> b. Senior Engineer.This project was a 10-mile new alignment bypass of the old Saddle Rd. on the Big Island of <br /> Hawai'i.The project was performed for the Federal Hwy Administration,the Central Federal Lands Hwy Division, <br /> and HDOT-Hwy Division. Responsibilities: Performed hydrologic and hydraulic analyses and recommended <br /> drainage improvements to be included in the Preliminary Design Plans. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honolulu Rail Transit(East Kapolei to Aloha Stadium) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawaii 2010 <br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Senior Engineer. Performed hydraulic and scour analysis of the rail columns at the channel/stream crossings <br /> near the junction of H2 and Farrington Hwy and near the intersection of Kualakai Pkwy and Hoomohala Ave. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lone Mountain/Beltway Detention Basins and Gowan Beltway Chnl PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Clark County, Nevada 2008 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Senior Engineer.This project consisted of 600 acre-feet dual detention basins connected by a balance conduit <br /> with a dual level of outfall flow control & a number of inflow storm drains and channels, including a 2-mile inflow <br /> d. channel that conveys up to 3800 cfs. Responsibilities: Performed hydrologic analyses for a drainage area over 10 <br /> sq. mi.; coordinated with another engineering firm in reconciling the hydrology of the project with that of the Las <br /> Vegas Valley 2008 Master Plan Update; performed hydraulic analyses and design of the drainage facilities that <br /> included dual detention basins, emergency spillways, balance conduit, dual level outfall orifices, stepped spillway <br /> channels, inflow storm drains and channels with energy dissipaters; prepared design report; QA/QC of plans and <br /> specifications <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Gowan Outfall Lone Mountain Branch—Rancho to Decatur PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Las Vegas, Nevada 2008 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Senior Engineer.This project was a 2.2-mile storm drain system that consisted of RCB5 ranging from 6-ft X 6-ft to <br /> 14-ft X 7-ft and conveyed up to 1600 cfs. Responsibilities: Performed hydraulic analyses and design of the 2.2- <br /> e. mile RCB storm drain system that includes the mainline, laterals, and drop inlets; reviewed drawings and plans <br /> for quality control and quality assurance; prepared 30%, 70%, 90%, and final hydraulic design reports; identified <br /> and resolved <br /> utility conflicts; coordinated with City of Las Vegas, Clark County Regional Flood Control, and Nevada Department <br /> of Transportation <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />