Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) (y Z-11 r t <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jordan Moniuszko, PE CCM Environmental/Civil Engineer, a.TOTAL b.WITH CURRENT FIRM <br /> Construction Manager 15 10 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> B.S. /2009/Mechanical Engineering Hawaii/Civil Engineering/2018 <br /> B.S. /2009/Environmental Science <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 2009/SCUBA Open Water; 2009/Environmental Compliance Training and Tracking System; 2010/OSHA 30 Hour Construction <br /> Safety& Health; 2010/National Pollutant Discharge Elimination System Awareness; 2013/CPR&First Aid; 2013/OSHA 24 Hour <br /> Confined Space Competent Person; 2014/Hawaii DOBOR Safe Boating; 2021 /OSHA 2 Hour Asbestos Awareness <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waikiki Aquarium Effluent Disposal System Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawai'i Ongoing 2024(Est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> a. Project Manager for this project to evaluate, permit, and design upgrades to the aquatic life exhibit effluent <br /> disposal system in order to meet updated NPDES regulatory requirements.The team consisted of civil, electrical, <br /> and mechanical engineers, biologist, hydrogeologist, and aquatic life support system specialist. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Anahola Farm Lots Subdivision Water System Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Anahola, Hawai'i Ongoing 2022(Est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> b' Project Engineer for this project to replace a rural subdivision 0.5 MG water tank, water transmission lines and <br /> appurtenances, and install a system interconnection with County water system.The team consisted of civil, <br /> structural, mechanical, and electrical engineers. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> IAB Basement Water Infiltration Repairs at Daniel K Inouye Intl Airport PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawai'i Ongoing 2023(Est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> C. Project Engineer for this project to investigate sources of and design repairs for flooding to the basement of the <br /> overseas terminal at Honolulu International Airport. A variety of techniques were used to scan concrete and <br /> gather data to confirm sources of water infiltration. Final design includes repairs to floor slab, exterior and <br /> interior drainage improvements, and new floor slab installation. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Salt Lake Watershed Structural BMP Implementation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Salt Lake, Hawai'i 2021 2022 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> d. Project Engineer for this project to install remote sensors and stormwater samplers, collect water quality and <br /> meteorologic data, develop and calibrate a watershed model, model various BMP scenarios, design various <br /> structural stormwater Best Management Practice measures, and provide construction management services at <br /> Salt Lake Watershed in urban Honolulu. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ka'elepulu Pond &Wetland Environmental Maintenance Dredging PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kailua, Hawai'i Ongoing 2022(Est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> e. Design Engineer and Construction Manager for an ecosystem restoration project to reconnect two estuarine <br /> bodies of water located in Windward Oahu. Federal, State and local permits and implementation of associated <br /> regulatory conditions were required prior to construction. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahalu'u Flood Control Lagoon Maintenance Dredging Kaneohe, Hawai'i PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> for Department of Design and Construction 2016 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> f' <br /> Project Engineer for this windward Oahu maintenance dredging and upland disposal project currently in progress <br /> for the City and County of Honolulu. Wrote and executed Sediment Sampling and Analysis Plan. Performed <br /> upland disposal scenario and cost estimate analysis. To perform design and services during bidding. <br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1 <br />