|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Marvin D. Heskett, III Senior Chemist a.TOTAL b.WITH CURRENT FIRM
<br /> 35 10
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC (Aiea,Hawaii)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Biochemistry, California Polytechnic University Certified Asbestos Inspector, HIASB-4631
<br /> Certified Lead Risk Assessor, PB-1150
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training Sampling for Defensible Environmental Decisions, Basic
<br /> OSHA 8-hour HAZWOPER Refresher Training and Advanced
<br /> OSHA 30-hour Construction Safety and Health Training Confined Space Training
<br /> Shipley Group NEPA Training Hazardous Waste Site Supervisor Training
<br /> Advanced Systems QA/QC 40-hour Course Maritime Security Awareness Training(MARSEC)
<br /> E3 Data Quality Objective Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Preconstruction Activities for the Applicable Monitoring and PROFESSIONAL SERVICES CONSTRUCTION
<br /> Assessment Plan for the Honolulu Rail Transit Project,Waiawa 2019 N/A
<br /> Tributary and Waiawa Stream,WQC0789, Pearl City,Oahu,Hawaii
<br /> 8 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 completed preconstruction monitoring in compliance with an AMAP for construction within the U.S.
<br /> waterway of Waiawa Stream, prior to the construction of a concrete pier within the high-water mark. E2
<br /> conducted three phases of stream monitoring to ensure construction did not impact stream water quality.
<br /> Fee: $70,000 (per year). Role: Senior Chemist.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Sewer Condition Analysis Dieldrin Study,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION
<br /> Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> b. E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling
<br /> and testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results.
<br /> E2 is developing recommendations for sewer improvements, identify priority sewers for reduction of
<br /> infiltration and inflow, developing reports to address State and Federal permit requirements, and assisting
<br /> with the scoping of wastewater capital improvement projects. Fee: $539,517. Role: Senior Chemist.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Water Quality Monitoring,Rip-Rap Repair and Floating Dock,USCG PROFESSIONAL SERVICES CONSTRUCTION
<br /> Station,Nawiliwili Small Boat Harbor,Lihue,Kauai,Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 completed an Applicable Monitoring and Assessment Plan (AMAP) to monitor impacts on harbor water
<br /> C. quality from a U.S. Coast Guard in-water construction project. E2 created a work plan, established baseline
<br /> conditions by monitoring water quality parameters before construction, monitored water quality from a
<br /> vessel in and around the construction project, assessed the final water quality post construction, and
<br /> generated a final report. The project lasted a total of five weeks and ended with a comprehensive letter
<br /> report and recommendations. Fee: $60,000. Role: Assistant Project Manager/Senior Chemist.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Storm Water Management Plan Update for Commander Navy Region PROFESSIONAL SERVICES CONSTRUCTION
<br /> Hawaii,JBPHH,Oahu,Hawaii Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 completed inspections and updated the SWMP for CNRH under their NPDES permit. The SWMP contained
<br /> d. several program components including public education and outreach, illicit discharge detection and
<br /> elimination, construction site runoff control, post-construction stormwater management, pollution
<br /> prevention and good housekeeping, stormwater monitoring, and reporting. Developed Storm Water Pollution
<br /> Control Plans for 68 Navy industrial facilities. Provided gap analysis of previous/new permit requirements.
<br /> Fee: $452K. Role: Senior Chemist.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 9
<br />
|