Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Candace K.Yamauchi, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 19 13 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> B.S.,Earth and Environmental Engineering, Columbia Registered Professional Engineer,HI - Civil No. 16320 <br /> University Certified Asbestos Inspector, HIASB-3840 <br /> Certified Lead Risk Assessor, PB-1135 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training <br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors <br /> OSHA 30-hour Construction Safety and Health Confined Space Training <br /> Training Hazardous Waste Site Supervisor Training <br /> Qualified Stormwater Compliance Manager Bloodborne Pathogens, First Aid, CPR, and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Illicit Discharge Survey,Commander Navy Region Hawaii,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION <br /> Oahu,Hawaii 2016 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> a. Completed an illicit discharge survey for non-stormwater discharges to the CNRH's municipal separate storm <br /> sewer system (MS4) and waters of the U.S. in accordance with the NPDES permit issued. Inspected over 1,300 <br /> facilities, developed recommendations for possible corrections, and prepared the associated preliminary cost <br /> estimates. Fee: $393,019. Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waianae Agricultural Park Improvements,Waianae,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> 2017 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural <br /> b Park. The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration <br /> basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing <br /> concrete drainage swales. Responsible for preparation of construction documents (i.e., plans and <br /> specifications) and services during bidding and construction. The construction plans were completed on an <br /> accelerated schedule to meet the funding requirements for construction. Fee: $60,000. Role: Senior <br /> Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimanalo Wastewater Treatment Plant Effluent Reuse Feasibility PROFESSIONAL SERVICES CONSTRUCTION <br /> Study,Waimanalo,Oahu,Hawaii 2014 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent <br /> C. reuse from the Waimanalo Wastewater Treatment Plant. Responsible for the identification of potential users <br /> and locations, including the reuse demand, and transmission and storage requirements.Tasks included public <br /> outreach, data collection, research of prior studies, and evaluation of costs. Prepared a conceptual layout and <br /> cost estimate for the preferred WWTP upgrades and transmission and storage requirements for users with <br /> strong interest in reuse. Fee: $219,345. Role: Senior Environmental Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Navy Region Hawaii Stormwater Management Plan,JBPHH,Oahu, PROFESSIONAL SERVICES CONSTRUCTION <br /> Hawaii 2016 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> 2 prepared a SWMP for Navy Region Hawaii in accordance with their NPDES permit. The SWMP contained <br /> d. several program components including public education and outreach; illicit discharge detection and <br /> elimination; construction site runoff control; post-construction stormwater management; P2 and good <br /> housekeeping; stormwater monitoring; and reporting. Developed Stormwater Pollution Control Plans <br /> (SWPCPs) for 25 industrial facilities. Responsibilities included conducting facility inspections and interviews, <br /> coordination with client and facility managers, and preparing the document for submittal. Fee: $291,000. <br /> Role: Environmental Engineer. <br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 10 <br />