|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Candace K.Yamauchi, P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 19 13
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br /> B.S.,Earth and Environmental Engineering, Columbia Registered Professional Engineer,HI - Civil No. 16320
<br /> University Certified Asbestos Inspector, HIASB-3840
<br /> Certified Lead Risk Assessor, PB-1135
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training
<br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors
<br /> OSHA 30-hour Construction Safety and Health Confined Space Training
<br /> Training Hazardous Waste Site Supervisor Training
<br /> Qualified Stormwater Compliance Manager Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Illicit Discharge Survey,Commander Navy Region Hawaii,JBPHH, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Oahu,Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> a. Completed an illicit discharge survey for non-stormwater discharges to the CNRH's municipal separate storm
<br /> sewer system (MS4) and waters of the U.S. in accordance with the NPDES permit issued. Inspected over 1,300
<br /> facilities, developed recommendations for possible corrections, and prepared the associated preliminary cost
<br /> estimates. Fee: $393,019. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waianae Agricultural Park Improvements,Waianae,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION
<br /> 2017 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Completed the design of miscellaneous improvements to the drainage system at the Waianae Agricultural
<br /> b Park. The improvements included slope stabilization of drainage ways, diversion of runoff into an infiltration
<br /> basin, design of overflow protection drainage intakes for the infiltration basin, and repairs to existing
<br /> concrete drainage swales. Responsible for preparation of construction documents (i.e., plans and
<br /> specifications) and services during bidding and construction. The construction plans were completed on an
<br /> accelerated schedule to meet the funding requirements for construction. Fee: $60,000. Role: Senior
<br /> Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimanalo Wastewater Treatment Plant Effluent Reuse Feasibility PROFESSIONAL SERVICES CONSTRUCTION
<br /> Study,Waimanalo,Oahu,Hawaii 2014 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent
<br /> C. reuse from the Waimanalo Wastewater Treatment Plant. Responsible for the identification of potential users
<br /> and locations, including the reuse demand, and transmission and storage requirements.Tasks included public
<br /> outreach, data collection, research of prior studies, and evaluation of costs. Prepared a conceptual layout and
<br /> cost estimate for the preferred WWTP upgrades and transmission and storage requirements for users with
<br /> strong interest in reuse. Fee: $219,345. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Navy Region Hawaii Stormwater Management Plan,JBPHH,Oahu, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> 2 prepared a SWMP for Navy Region Hawaii in accordance with their NPDES permit. The SWMP contained
<br /> d. several program components including public education and outreach; illicit discharge detection and
<br /> elimination; construction site runoff control; post-construction stormwater management; P2 and good
<br /> housekeeping; stormwater monitoring; and reporting. Developed Stormwater Pollution Control Plans
<br /> (SWPCPs) for 25 industrial facilities. Responsibilities included conducting facility inspections and interviews,
<br /> coordination with client and facility managers, and preparing the document for submittal. Fee: $291,000.
<br /> Role: Environmental Engineer.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 10
<br />
|