|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12 TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Austin A.Lutey,E.I.T. Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 16 16
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC,Aiea,Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil and Environmental Engineering, UCLA Engineering-in-Training(E.I.T.)
<br /> Certified Asbestos Inspector, HIASB-3199
<br /> Certified Lead Risk Assessor, PB-0440
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training
<br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors
<br /> OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training
<br /> Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> Confined Space Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Closure Activities and Removal of Under,and In-Ground Structure at PROFESSIONAL SERVICES CONSTRUCTION
<br /> Former JN Chevrolet Location,Haleiwa,Oahu,Hawaii 2021 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. E2 previously completed a Limited Phase II ESA as part of the due diligence process to detect any environmental
<br /> issues for property acquisition in 2017. Areas of concern were recommended for additional sampling to
<br /> evaluate the nature and extent of contamination. Fieldwork included discrete soil sampling and groundwater
<br /> sampling from the UST excavation. Responsibilities for this project included groundwater sampling. Fee:
<br /> $57,1910.Role: Environmental Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Sembawang,Singapore 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint(LBP) inspection including an
<br /> LBP risk assessment(LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead dust
<br /> at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, thoroughly
<br /> documenting all fieldwork activities with notes and photography, and preparing computer aided design (CAD)
<br /> drawings. Fee: $1,858,355.Role: Environmental Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Asbestos Survey,Naval Base Guam PROFESSIONAL SERVICES CONSTRUCTION
<br /> 2020 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for
<br /> c.
<br /> the NAVFAC Pacific. E2 prepared a Work Plan and Health and Safety Plan prior to fieldwork. A total of 7,134
<br /> bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared Draft
<br /> and Final survey reports that included a summary table of findings,plans with approximate locations of samples
<br /> taken, extent of most homogeneous areas (HAs), a closeup and panoramic photo log of samples, and laboratory
<br /> reports. Responsibilities included preparation of the WP and HSP, fieldwork coordination, fieldwork, and
<br /> preparation of the Draft and Final Survey Reports.Fee: $1,065,234.Role: Environmental Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Operation and Maintenance and Monitoring for Multiple Sites, PROFESSIONAL SERVICES CONSTRUCTION
<br /> JBPHH,Oahu,Hawaii 2013-2017 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 completed four years of Operation and Maintenance (O&M) of two oily waste collection and treatment
<br /> facilities within the PHNSY. E2 has managed hazardous and oily wastes recovered from two product recovery
<br /> d systems installed at the Building 8 and Oscar 2 Pier former release sites. The Building 8 system includes three
<br /> Fuel Oil Skimmer System (FOSS) units while the Oscar 2 Pier consists of five FOSS units. E2 conducted weekly,
<br /> monthly, and quarterly inspections and maintenance in order to keep both product recovery systems up and
<br /> running efficiently. E2 completed system repairs, oily product gauging of over 100 wells, fuel profile sampling,
<br /> NPDES compliance sampling, disposal of recovered product, and system trouble-shooting. Fee: $431,080.
<br /> Role: Environmental Engineer.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 14
<br />
|