Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Danny C. Liu Chemical Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 36 9 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC,Aiea,Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Chemical Engineering, University of Colorado at Certified Asbestos Inspector, HIASB-4653 <br /> Boulder Certified Risk Assessor/Lead Inspector, PB-1136 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA Initial HAZWOPER Training, 40-HR Hazardous Waste Site Supervisor Training <br /> OSHA Refresher Training, 8-HR Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Construction Engineering and Inspection for Honolulu Rail PROFESSIONAL SERVICES CONSTRUCTION <br /> Transit Project,Honolulu, Oahu,Hawaii 2015-2019 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Mr. Liu served as an Environmental Compliance Monitor for the West Sector of the Honolulu Rail Transit project <br /> that spans from Kapolei to Aloha Stadium. Responsible for monitoring the Contractor's performance of <br /> a. environmental monitoring of the Construction Contract, which includes National Pollutant Discharge Elimination <br /> System (NPDES) permit compliance, 401 water quality certification compliance, noise permit compliance, air <br /> pollution compliance, and solid and hazardous waste compliance. He conducted weekly inspections of the <br /> construction sites to assess compliance with required Best Management Practices (BMPs), and mitigation <br /> measures required under the Final Environmental Impact Statement (EIS) and the Record of Decision (ROD). <br /> Fee: $300,000 (annually).Role: Environmental Compliance Monitor. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION <br /> Sembawang,Singapore 2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint (LBP) inspection including an <br /> LBP risk assessment (LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead dust <br /> at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, thoroughly <br /> documenting all fieldwork activities with notes and photography, and preparing computer aided design (CAD) <br /> drawings. Fee: $1,858,355.Role: Inspector. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Asbestos Survey,Naval Base Guam, Guam PROFESSIONAL SERVICES CONSTRUCTION <br /> 2020 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> E2 completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for the <br /> c. <br /> NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to fieldwork. A total of <br /> 7,134 bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared <br /> Draft and Final survey reports that included a summary table of findings, plans with approximate locations of <br /> samples taken, extent of most homogeneous areas (HAs), a closeup and panoramic photo log of samples, and <br /> laboratory reports. Responsibilities included preparation of the WP and HSP, fieldwork coordination, fieldwork, <br /> and preparation the Draft and Final Survey Reports.Fee: $1,065,234.Role: Inspector. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Illicit Discharge Storm Water Inspections for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION <br /> Region Hawaii,Joint Base Pearl Harbor-Hickam,Oahu,Hawaii 2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> E2 completed an illicit discharge survey for non-storm water discharges to CNRH municipal separate storm <br /> d. sewer (MS4) and waters of the U.S. in accordance with the NPDES permit issued. The project scope includes <br /> inspections of over 1,800 sites at Naval installations throughout the island of Oahu. The inspections are to <br /> identify any existing or potential sources of illicit discharges at each facility. E2 completed field inspections and <br /> prepared a report summarizing the findings. Responsibilities included: conducting inspections, identifying <br /> corrective actions, updating the database for submittal, and preparation of conceptual designs and cost estimates <br /> for corrective actions.Fee: $365,424. Role: Inspector. <br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 15 <br />