Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS OF EXPERIENCE <br /> Ryan S.W.Yamauchi,P.E. Principal Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 32 19 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC (Aiea,Hawaii) <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.S., Civil/Environmental Engineering,UC Berkeley Registered Professional Engineer,HI-Civil No.9566 <br /> B.S., Civil Engineering,University of Hawaii at Manoa Certified Asbestos Inspector, HIASB-2905 <br /> Certified Lead Risk Assessor, PB-0117 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness <br /> OSHA 8-hour HAZWOPER Refresher Training Training for Contractors <br /> OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training <br /> Maritime Security Awareness Training(MARSEC) Bloodborne Pathogens, First Aid, CPR, and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaneohe Bay No.2 Wastewater Pump Station Force Main PROFESSIONAL SERVICES CONSTRUCTION <br /> Improvements,Kaneohe,Oahu,Hawaii 2017 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Design alternatives analysis for the replacement of the existing 14-inch force main.Alternatives analyzed included <br /> a. horizontal directional drilling, pilot tube microtunneling, and open-cut trenching the new alignment across an <br /> existing waterway. Completed design drawings and specifications for the selected alternative, horizontal <br /> directional drilling. Prepared the Engineering Design Alternatives Report, completed design calculations for the <br /> pumps and force main design, prepared design drawings and specifications, and other necessary permit <br /> documents. Fee: $520,000. Role: Project Manager/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reconstruction/Replacement of Sewers, Ho'omaluhia Botanical PROFESSIONAL SERVICES CONSTRUCTION) <br /> Gardens,Kaneohe,Oahu,Hawaii Estimated 2024 Estimated 2024 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 completed planning, design, and preparation of construction documents for the reconstruction/replacement of <br /> b. existing sewer lines. Phase I included the cleaning and CCTV inspections in accordance with the Pipeline <br /> Assessment Certification Program. Phase II assessed the sewer line deficiencies from the CCTV data, developed <br /> rehabilitation/replacement alternatives for the system, prepared schematic and concept drawings for the <br /> recommended alternatives, and prepared a cost estimate for the recommended improvements. E2 will prepare <br /> construction documents for Phase III. Fee: $840,000. Role: Program Mana er/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Sewer Condition Analysis Dieldrin Study,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> c. <br /> E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling and <br /> testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results. E2 is <br /> developing recommendations for sewer improvements, identifying priority sewers for reduction of infiltration <br /> and inflow, developing reports to address State and Federal permit requirements, and assisting with the scoping <br /> of wastewater capital improvement projects. Fee: $339,517. Role: Program/Manager/Principal Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Surveying Small-Scale Waste to Energy Conversion Opportunity PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Considering Strategic DoD Locations in Hawaii,Hawaii 2023 apNcable) <br /> N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> d. E2 gathered non-hazardous solid waste data from various installations and evaluated the waste composition to <br /> determine the amount of feedstock that could be used in a Small-Scale WTE unit. Costs were compared to the <br /> projected cost avoidance of landfill tipping fees due to solid waste reduction. Recommendations made for further <br /> evaluation of DoD facilities that generate enough waste to support small-scale WTE technologies and where costs <br /> were close to or under the estimated cost avoidance. Fee: $102K. Role: Principal Engineer. <br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025-PAGE 2 <br />