E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE
<br /> Roger C.Aoki,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 28 18
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC (Aiea,Hawaii)
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S., Civil/Environmental Engineering, Purdue University Registered Professional Engineer,HI -Civil No. 10019
<br /> B.S., Civil Engineering,University of Hawaii at Manoa
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training
<br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors
<br /> OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training
<br /> Confined Space Training Bloodborne Pathogens, First Aid, CPR, and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Site Investigation for Abandoned AVGAS/MOGAS Pipeline,Pearl City PROFESSIONAL SERVICES CONSTRUCTION
<br /> Peninsula,Joint Base Pearl Harbor-Hickam (JBPHH),Oahu,Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 conducted a Site Investigation (SI) for the abandoned aviation gasoline (AVGAS) and motor gasoline (MOGAS)
<br /> a. pipeline running from the former Pearl City Fuel Annex to the waterfront fueling and cargo wharves on Pearl City
<br /> Peninsula within JBPHH. The objectives of the project were to delineate and characterize the nature and extent
<br /> of contamination in the soil, groundwater, and soil gas caused by historic releases of AVGAS/MOGAS; to conduct
<br /> an environmental hazard evaluation; and to provide a basis for developing effective remedial measures and
<br /> response actions for the area. Fee: $375,000.Role: Project Manager/Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Stormwater Drainage System Survey,JBPHH,and Outlying Areas, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Oahu,Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. E2 created an integrated, scaled, and detailed stormwater drainage map and database for all areas of JBPHH. The
<br /> maps and results of the survey was used to determine areas in need of repairs or cleaning. The project included a
<br /> survey and condition assessment of all stormwater drain features; and in specified situations, sediment sampling
<br /> and analysis, to create a detailed base-wide stormwater drainage map and database. Fee: $1,799,119. Role:
<br /> Project Manager.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Feasibility Study,Proposed Plan,and Record of Decision for the Open PROFESSIONAL SERVICES CONSTRUCTION
<br /> Area Near Building 992,Pearl City Peninsula,JBPHH, Oahu,Hawaii 2016 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 conducted a Feasibility Study (FS), Proposed Plan (PP) and Record of Decision (ROD) that would lead to long-
<br /> term management of the site to control the exposure of contaminants. While scoping the FS, E2 was able to
<br /> c. facilitate discussions between the Navy and the regulators, the U.S. Environmental Protection Agency (EPA)
<br /> Region IX and the State of Hawaii, Department of Health (DOH) Hazard Evaluation and Emergency Response
<br /> (HEER) Office; to obtain Site closure with No Further Action (NFA). E2 developed the PP and ROD decision
<br /> documents, as required by the Comprehensive Environmental Response, Compensation, and Liability Act
<br /> (CERCLA), to close the Open Area Near Building 992. The project also included procuring the venue, running
<br /> announcements in the newspaper, and preparing the presentation for the public meeting presenting the PP to
<br /> the public. Fee: $174,256. Role: Project Manager/Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Kalewa Wastewater Pump Station Improvements Design PROFESSIONAL SERVICES CONSTRUCTION
<br /> Honolulu, Oahu,Hawaii 2018 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 completed an engineering design of a new packaged wastewater pump station and new dual relief force main
<br /> d for the Kalewa Street wastewater pump station. Evaluated present and future wastewater flows from the
<br /> tributary, sized and selected the new packaged pump station,and completed construction documents for the new
<br /> packaged wastewater pump station and new dual relief force main. Integral to the design was planning the
<br /> phasing of construction, which would allow continued and uninterrupted use of the airport facilities by the
<br /> tenants during construction. Fee: $52,000. Role: Senior Environmental Engineer.
<br /> ELEMENT ENVIRONMENTAL, LLC COUNTY OF HAWAII, FISCAL YEAR 2025—PAGE 3
<br />
|