|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) (y Z-11 r t
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Dayananda H.Vithanage, PhD, PE Principal,QA/QC a.TOTAL b.WITH CURRENT FIRM
<br /> 55 34
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Ocean it Laboratories, Inc, Honolulu, Hawai'i
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS, Civil Engineering Civil Engineer, Hawai'i
<br /> MS, Coastal Engineering
<br /> PhD, Ocean Engineering
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Dr. Vithanage is responsible for overseeing the technical quality of each project. He reviews project deliverables for quality
<br /> assurance and quality control (QA/QC). He is involved with all stages of projects at Oceanit. He has served as the principal
<br /> investigator for many coastal, civil, environmental,watershed, and environmental remediation projects throughout the state.
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honouliuli Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 'Ewa Beach, Hawai'i 2012
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Principal-in-charge for investigating the feasibility and environmental impacts of extending the existing outfall to
<br /> a. obtain a National Pollutant Discharge Elimination System (NPDES) permit for future wastewater disposal from
<br /> the treatment plant for the City and County of Honolulu. Installed two water column monitoring data buoys at
<br /> the two depths and analyzed data for one year to evaluate the impacts on the water column. Conducted dye
<br /> studies to model far field dispersion and plume fate. Developed conceptual outfall extension designs. Near real-
<br /> time data and results were posted to an extranet website.The approximate project cost was$680,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> 'Aliomanu Road Coastal Erosion Control PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Anahola, Hawai'i 2013
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Principal-in-charge for the design of an emergency erosion control and protection solution for'Aliomanu Road
<br /> b. using coconut fiber sandbags for the County of Kaua'i. Conducted topographic and beach surveys, designed a
<br /> permanent shore protection solution, and prepared an environmental assessment and plans, specifications, and
<br /> cost estimates (PS&Es). Submitted applications for all required federal, state, and county permits for approval.
<br /> The design included a revetment and the rebuilding of the road and shoulder.The approximate project cost was
<br /> $197,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ala Wai Canal Watershed Flood Mitigation and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Ecosystem Restoration Project, O'ahu, Hawai'i 2013
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Principal-in-charge for the development of designs for flood alleviation in Waikiki and restoration of ecosystems
<br /> in the upper watershed that includes Palolo, Manoa, and Makiki streams. Oceanit helped develop the project
<br /> c. scope conceptual designs to mitigate intensity of flooding in Waikiki and restoring the functionality of the
<br /> streams that provide habitat and migration path for endemic fish. Numerous informational meetings with State
<br /> and County agencies, stakeholders, environmental groups, and the general public were held to discuss the
<br /> stream problems, their impacts, and proposed restoration measures. Oceanit completed a hydrographic survey
<br /> for Ala Wai Canal and part of the Ala Wai Boat Harbor. A hydrologic and hydraulic analysis was also completed
<br /> for the watershed.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Water Infiltration in the Basement of the International Arrivals Building PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Daniel K. Inouye International Airport(HNL), O'ahu, Hawai'i Phase 1: July 2019
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Principal-In-Charge for investigation and preliminary design of a complete solution to stop water infiltration in
<br /> the basement of the International Arrivals Building(IAB) at HNL.The basement has been afflicted by continuous
<br /> d
<br /> ' water infiltration (average 40 gallons per minute) and flooding events for the past two decades; a chronic
<br /> problem that renders some areas unusable and impedes access to mechanical equipment and storage. After
<br /> reviewing as-built plans, the Oceanit team investigated water infiltration sources into the basement,tested
<br /> chemical composition of the infiltrating water and developed conceptual designs to prevent the infiltration and
<br /> provided a report of the findings and recommendations. Phase 1 cost: $550,000.
<br /> STANDARD FORM 330 ( REV. 7/2021) PAGE 1
<br />
|