Laserfiche WebLink
Co-location that results in a ‘substantial <br />change’ to the tower height or ground lease <br />issuance of a new plan approval. <br />Section 25-2-74(12) requires a statement that a Has no such provision. <br />geotechnical analysis of the soil conditions <br />adequate to assure the stability of the <br />proposed antenna or tower. <br /> <br />Section 25-2-74(13)requires a maintenance Has no such provision. <br />plan in accordance with industry standards. <br /> <br /> <br /> <br />Section 25-2-74(14) requires acopy of all Has no such provision. <br />required licenses issued by the Federal <br />Communications Commission applicable to <br />the proposed use. <br /> <br />Section 25-2-74(15) requires a declaration that Has no such provision. Planning contents <br />the proposed use will be operational within two redundancy; two year deadline already <br />years of the date of the plan approval. required for all Planning approvals. <br /> <br /> <br />Section 25-2-74(16) A description of all lighting Section 25-4-12(g) The telecommunication <br />antenna or tower shall comply with all <br />used in connection with the proposed use, cted agencies, <br />including a statement explaining how the including the FAA and FCC. All exterior lighting, <br />except safety beacons required by the FAA, <br />shall be shielded to protect migrating birds. <br />Section 25-4-12(d)requires that Section 25-4-12(d)(2) requires that <br />telecommunication antenna or tower shall not telecommunication towers must be sited at <br />be permitted within one thousand feet of any least 1,200 feet from nearby residences and <br />property line of any hospital, school, or schools not on the subject property. <br />residential district. <br /> <br />Has no such provision, other than the same Section 25-4-12(d)(3) states that <br />120% of tower height property line setback telecommunication towers located within V, <br />requirement. <br />districts shall be exempt from the property line <br />setbacks requirements stated in Section 25-4- <br />(d)(1):” Telecommunication towers shall be set <br />back from every property line no less than one <br />hundred and twenty percent of tower height.” <br /> <br />