Laserfiche WebLink
Bill 194Planning’s Bill <br />Section 25-4-12(f) states that the director may Has no such provision. <br />engage a private consultant to inspect and <br />determine whether the proposed use violates <br />any applicable standard of the Federal <br />Communications Commission, with a pause <br />on the two year project completion deadline <br />during such consultation. <br /> <br /> <br />Section 25-4-12(g) requires that no Has no such provision. <br />telecommunication antenna may produce at <br />any time power densities or radio frequency <br />exposure levels that exceed the current <br />standards of the Federal Communications <br />Commission regarding radio frequency <br />emissions applicable to the proposed use. <br /> <br /> <br />Section 25-4-12(h) requires an order of priority Has no such provision. <br />for location of telecommunication antennas or <br />towers to be 1) On building sites with existing <br />telecommunication antennas or towers, 2) On <br /> lands, and 4) <br /> <br /> <br /> <br /> <br />Section 25-4-12(i) requires that the design of Has no such provision. <br />the telecommunication tower shall include: <br />tower and all associated equipment shall be of <br />non--materials, <br />shielded and surge-protected against electrical <br />isplays the owner of the <br />antenna or tower, information by which the <br />and a telephone number for the owner or the <br />owner’s representative with responsibility for <br />the antenna or tower, and except that where no <br />public road borders the subject property, such <br />signage shall be posted at or near all property <br />boundaries adjacent to properties not owned <br />by the owner of the building site. <br /> <br /> <br /> <br /> <br />